My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03189
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:13 AM
Creation date
10/9/2006 3:47:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Colorado River Basin-Water Projects-Central Utah Participating Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/12/1988
Title
Central Utah Project-Ceiling Increase Legislation-Study WP1-WP2-WP4-PP1-PP4 and PP6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" , <br /> <br />.' <br />, <br /> <br />AUG 1 8 198'0 <br /> <br />STUDY I WP-2 <br />Fl LE NAMES: <br />RSPAYI. <br />RSPAYP. <br /> <br />BASE STUDY <br /> <br />C'I <br /> <br />Assumptions <br />. FY 1987 CRSP PRS except: <br />. No fuel replacement sales. <br />. No purchased power expense for fuel replacement sales. <br />. 1987 replacements as corrected. <br />. Present worth participating projects "Sunk Costs" (projects completed <br />and under construction, plus Animas-LaPlata Phase I, plus $112 million <br />Aid to Irrigation less M&I revenues). Service bonds at ~% as an other <br />expense. <br />. M&I revenues applied to bond payments. <br />. Power investment includes construction scheduled for completion <br />through 1995 from the 1989 Congressional and 1990 internal budgets. <br />. No future participating projects except as described above. <br />. No apportionment to states. <br />. Rate effective in 1990. <br />. Study ends in 2070. <br />. Base rate of 9.58 mills/kWh. <br /> <br />COMPARATIVE STUDY: <br /> <br />PURPOSE: Water Users Proposal - Assess the impact of the Water Users <br />proposal on power rates. <br />r No cut off on the 8.5 mill completion component. <br /> <br />Compo Component: <br />Compo Component: <br />Compo Component: <br /> <br />Rate: Fl at <br /> <br />Rate .0085 <br />Rate - <br />Rate <br /> <br />Start 1995 Stop N/A <br />Start Stop <br />Start - Stop <br /> <br />ARD X Stepped: Yr._____ Rate_ yr.____ Rate_____ <br /> <br />Special Requirements: Repay power investment on line as of the date the <br />legislation enacted by 1994. <br />Assumption: All investment scheduled bor completion by 1990 would be <br />repaid by 1994. Balance of investment to be repaid in the normal <br />manner. <br />Used fiscal years instead of beginning in January (calendar years). <br /> <br />---------------------------------------------------------------------I;~----- <br />Results of StUdy: Rate Ib, '1'C Pinch Point I&J?~ Cause A~t'nJ~~A4c. <br /> <br />$ avai 1 ab le to Water Users: 1990-2000;:2 G'~ ,J3 7.. <>,00 <br />. 2001-2010 ~ 7 3, 7"~o, .s71v <br />tf . <br />Total for all years _ 3.1 f'7;2...1 / () 9:,000 / <br /> <br />2285 <br /> <br />::r:/I-&...-.lJ!- PX ,,0.........- ::r>1.c-,U-/~ <br />~.f~.I- Ch'-- ~ <br />1~( :h.--f~L.r1- ~ b~13C2,771 <br /> <br />"be, 99 "~~ <br />;2/3C-:;;Zy,? <br />
The URL can be used to link to this page
Your browser does not support the video tag.