My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03186
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:12 AM
Creation date
10/9/2006 3:47:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.800
Description
Colorado River - Colorado River Basin - Colorado River Basin General Correspondence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1982
Title
Water for Energy, Upper Colorado Basin Monthly Report, May-June 1982
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />002307 <br /> <br />2 <br /> <br />U,S, Fish and Wildlife Service <br />Colorado River Fishery Project Team <br />Salt Lake City, UT <br /> <br />Briefing on the Colorado River <br />Conservation Plan <br /> <br />B. Plans for Future Contacts, <br /> <br />Plans are being made to contact the State Engineers' Office in <br />Wyoming to secure water rights infol1Ilation for the Green and <br />Little Snake Rivers. <br /> <br />Demonstration of the HYDRj:'lSS model has been placed on hold tmtil <br />HYDRj:'lSS is more fully developed, To insure that the HYDR0SS modei <br />structure and input data are teclmically adequate, representatives <br />from potential users' groups will be involved early in the modeling <br />process and will continue to be involved as an actual test case is <br />set up, nm, and the model validated. The Service's goal is to have <br />this early involvement approach become a part of the planning for <br />future water resource development projects in the basin. <br /> <br />C, Progress on Database Developlrent, <br /> <br />The development of the catalog of UCRB Water and Energy Projects <br />is now complete and under review. Following the review process <br />the catalog will be published along with a map or maps of proj ect <br />locations, Work continues on the Development Network Database <br />(DNDB) with final keypunching and error checking tmOOrway at WELUT, <br />Upon completion of the data entry phase, the database will be <br />evaluated and transferred to FWS field offices in the UCRB. <br /> <br />D, Develop a ~GE iSuatic ~esource Q.atabase (Mi\QRDB) for the UCRB. <br /> <br />Work on the database structure for MAQRDB has been completed and <br />is tmOOr review, The structure has subsequently been submitted to <br />the Resource Management ~lethods Group (RM/.l;) at WELUf to secure a <br />bid for. the redigitizing of river reach maps for the UCRB and data <br />entry. The group also will be using expertise gained from imple- <br />menting the Reach File system for EPA to suggest ways in which the <br />Reach File fishery database and ,MAQRDB can be integrated, <br /> <br />Attached as Exhibit A is the current data fOl1Ilat for the MAQRDB, <br />The control points referenced are the control points assigned to the <br />HYDRj:'lSS lvbdel which is discussed later. <br /> <br />Work on collection of input data for MAQRDB contimles with emphasis <br />on infol1Ilation on water rights, depletions, and return flows taking <br />priority. Water right information has been ordered from the Colorado <br />Department of Natural Resources and contacts were made in Utah to <br />obtain water rights infol1Ilation on the Duchesne River, <br />
The URL can be used to link to this page
Your browser does not support the video tag.