Laserfiche WebLink
<br /> Schedu e and Budpet for Task 6 <br />Subtask Description Stan Dale End Dale Budgel (5) <br />No. Boyle <br /> RTi Tow <br />6.01 Phase IIlnsueam Flows Ian 6.97 Ian 13, g] 5900 SO 5900 <br />6.02 Map Preparation lull,96 Ian 13. g] SO SO SO <br />6,03 Aggregale Irrigation S[fUctures lan13,g] Feb 28.97 56,400 SO 50,400 <br />6.04 Add Aggregaled Structures 10 Feb 10,97 Feb 12,97 5I.300 SO 51,300 <br /> Network <br />6,05 Define Waler Right Classes Aug 29.96 Sep 9.96 $04.700 SO 54,700 <br />6,06 Assign Retum Flow Feb 10.97 Feb 28.97 52,800 SO 52,800 <br /> Characleristics <br />6_07 Generate Aggregated Aug 15,96 Aug 19,96 S600 SO 5600 <br /> Parameters <br />6.08 Assign Aggregated Irrigalion Aug 16.96 Aug 19,96 S600 SO S600 <br /> Efficiencies <br />6,09 Generale New .ddm and .ddh Feb 24.97 Feb 28,97 51.600 SO 51.600 <br /> Files <br />6.10 Aggregate M&I Demands Ian 6, 97 Ian 20,97 53,200 SO $3.200 <br />6.11 Aggregate Reservoirs and Stock Feb 20,97 Feb 3,97 54,000 SO 54,000 <br /> Ponds <br />6.12 Add Inslream Flows Mar 3,97 Mar 10,97 51.400 SO $1,400 <br />6.13 Generate Baseflows Mar 3, 97 Mar 10.97 55.000 SO $5.000 <br />6.P Calibration Mar 10.97 MarN.97 $1.600 SO 57,600 <br />6.15 Generale Baseline Dala Set Mar 24.97 Mar 25.97 S400 SO S400 <br />6.16 Engineering ~Iar 24,97 Mar 28,97 54,400 SO $4.400 <br /> ReportJDocumenl311on <br />Orner Direcl Charges (DOC) $5,800 SO $5,800 <br />Total Task Budget & by Consullanl Group I Aug 16.96 Mar 28,97 550,700 SO 550.700 <br /> <br />1030 <br /> <br />Phast' ilia Scope of Services <br /> <br />A,SQ <br /> <br />June 12. 1996 <br />