Laserfiche WebLink
<br />Task IIIa-6 San Juan/Dolores River Basin WRPM Enhancement <br /> <br />Objective: The San Juan/Dolores River basin model will be enhanced to include the <br />approximately 25 percent of current water use which was left "in the gage" in the <br />Phase II model. Additional diversions and storage structures will be aggregated to <br />produce a manageable data set and to avoid significantly degrading computational <br />performance, The final model will be calibrated and documented. <br /> <br />Prerequisite: The Phase II San Juan/Dolores River Basin model is documented and calibrated <br />with approximately 75 percent of the current water use modeled and with irrigation <br />demands based on the 1993 GIS mapping in the calculated scenario. <br /> <br />Assumptions: - Study period is 1975 through 1991. <br /> <br />- Total irrigation consumptive use is defmed as the consumptive use associated with the <br />irrigated acreage recorded in the CRDSS irrigated acreage spatial database, Structures <br />and water rights not tied to irrigated parcels will not be included in the model, but will <br />be documented as being excluded. <br /> <br />The subtasks for Task 6, San Juan Dolores River Basin WRPM Enhancement, are the same as the <br />subtasks for Task 3 except for the basin of interest, the allocated budget, the projected work <br />schedule, and certain work activities within the subtasks as described below: <br /> <br />Task Leader: Meg Frantz (Boyle) <br /> <br />{031 <br /> <br />. <br /> <br />Phase IlIa Scope of Services <br /> <br />A-49 <br /> <br />June 12, 1996 <br />