My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fmal report will fully replace the calibration section in the Phase II reports, <br />documenting methodology and Phase III vs. Historic results. <br /> <br />The Phase II report will be available to Boyle in word processor format that can be <br />direectIy imported to Microsoft Word for Windows. <br /> <br />Approach: <br />L Boyle: Prepare a Draft Engineering Report to the State, following the same organization <br />that was used for the Phase II Engineering Reports: <br />I. Executive Summary <br />II. Introduction <br />III, Model development <br />IV. Model Historical Data at 75% of Basin Water Use <br />V. Aggregated Modeling Data Description (Task Memos related to aggregation of <br />irrigation structures, determination of administration classes, calculation of <br />administration number, aggregation of M&I use, aggregation of storage rights, <br />additional instream flow rights, development of demand time series will be sections <br />within this chapter) <br />VI. Baseflow Generation <br />VII. Calibration <br />Appendix (technical material) <br /> <br />The report will be based on the Task Memoranda submitted throughout Task 3, although <br />significant revisions to subtask processes (as part of calibration, for example) will require <br />updating the memoranda. <br /> <br />The State will provide written comments to Boyle on the draft report within two weeks of <br />receipt. Boyle will finalize the report within two weeks of receiving the State's comments, <br /> <br />2, Boyle: Spend up to 12 hours finalizing the report and resubmit in word processing format <br />to the State, <br />3, STATE: Create on-line representation of final report. <br /> <br />Deliverables: <br />I, Draft Engineering Report and State comments on that draft report (six hard copies). <br />2, Final Engineering Report (10 hard copies and one copy in word processing form (Word for <br />Windows). <br />3, On-line representation of Final Engineering Report, <br /> <br />1038 <br /> <br />Phase IDa Scope of Services <br /> <br />A-42 <br /> <br />June 12, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.