My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Assumption: Instream flow rights on the mainstem and tributaries explicitly modeled in Phase II <br />will have already been included in the Phase II modeL This task pertains to instream <br />flow rights on tributaries which have been introduced into the model during Phase III. <br /> <br />Approach: <br /> <br />1. Boyle: Identify all new tributaries that have been added to the model under Task 3,04, <br />Review the CWCB instream flow listing to determine whether instream flow rights exist on <br />these tributaries. It is anticipated that approximately 5 new instream flow water rights would <br />be added to the model under this task. <br />2, Boyle: Manually edit the Phase II .ifr and .ifs files to reflect additional instream flow rights. <br />3. Boyle: Prepare a brief Task Memorandum describing how the newly added instream flow <br />water rights are represented in the model. It is expected to be 1 or 2 pages in length, The <br />State will provide written comments within two weeks of receipt. Boyle will finalize the <br />memo within two weeks of receiving the State's comments. <br /> <br />Deliverables: <br />1. List of instream rights to be added to Phase II model. <br />2. Modified Statemod input files to reflect new instream flows. <br />3. Task memorandum. <br /> <br />Task 3.13 Generate Basetlows <br /> <br />Objective: Generate streamflow time series for the baseflow nodes, The resulting data represent <br />the hydrologic condition upon which water demand is imposed when the model is <br />executed. <br /> <br />Assumption: Most aggregated structures will be imposed on the eXlstmg baseflow network; <br />however, it is estimated that a 10 percent increase in the number of baseflow nodes <br />may be required. If more than the 10 percent increase in baseflow nodes is required <br />resulting in more than the budgeted hours of labor for this subtask, the additional <br />baseflow nodes will be considered out of scope. <br /> <br />Approach: <br />1, Boyle: Delineate tributary area for each new baseflow node and transfer that to an average <br />precipitation isohyetal map, Planimeter the precipitation zones and determine precipitation <br />weighted area for the tributary. <br />2, Boyle: For each new baseflow node being added to the rietwork, check to see if a <br />significant stream flow gage (5 years within the study period) exists within the tributary <br />area. Fill in missing data using common regression techniques, and add the gage to the <br />network and the gage data file, <br />3, Boyle: Modify the required Statemod input files with the information derived in subtasks <br />3,13,2 and 3,13.1 <br /> <br />Phase IlIa Scope of Services <br /> <br />1042 <br /> <br />A-38 <br /> <br />June 12, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.