Laserfiche WebLink
<br />1043 <br /> <br />The decree weighted administration classes will fill both accounts (irrigation and non- <br />irrigation) for each aggregated reservoir node. <br />8. Boyle: Based on engineering judgement, generate an area-capacity curve and identify an <br />existing Phase II evaporation station or curve to model evaporation at the aggregated <br />reservoir . <br />9. Boyle: Develop the Statemod operating right and reservoir content input to implement <br />releases from the irrigation account such that 25 % of the account volume is released in July, <br />50% during August, and 25% during September. <br />10. Boyle: Manually edit STATEMOD input fIles (.rin, .dds, .ddr, .ddh, .ddm, etc.) to reflect <br />the location, capacity, water right administration number, operation, etc. of the aggregated <br />reservoir and stock pond nodes. <br />11, Boyle: Prepare Task Memorandum 4.11 describing the results of the previous step. The <br />memo will include the following: <br />· Detailed list of reservoirs not modeled in PhaseIl, including those in the W A TRIGHT <br />list but not aggregated. <br />· Description of the geographical areas represented by the aggregation, <br />· Description of the stock pond analysis. <br />· Location and capacities of aggregated reservoir nodes divided into irrigation and non- <br />irrigation accounts. <br />· Description of the aggregated decree weighted administration number determination. <br />· Description of the development of the aggregated area-capacity curve and selection of <br />evaporation curves. <br />Boyle will prepare a draft memo on which the State will provide written comments within <br />two weeks of receipt. Boyle will finalize the memo within two weeks of receiving the <br />State's comments. <br /> <br />Deliverables~ <br />1. List of storage decrees not modeled in Phase II, <br />2, Determined locations of four aggregated reservoir nodes, <br />3, Summary of stock pond capacities, <br />4. Account setup for aggregated reservoirs. <br />5, State review of aggregation process. <br />6, Estimated reservoir contents for use in baseflow generation. <br />7, Weighted administration numbers for aggregated reservoirs. <br />8, Estimated area-capacity relationships for aggregated reservoirs, <br />9, Modified operating right file reflecting aggregated reservoirs. <br />10, Modified Statemod input files, <br />11. Final task memo. <br /> <br />Task 3.12 Add Instream Flows <br /> <br />Objective: Add instream flow rights not included in Phase II to the model. <br /> <br />Prerequisite: Task 3,01 completed, <br /> <br />Phase IlIa Scope of Services <br /> <br />A-37 <br /> <br />June 12, 1996 <br />