My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Approach: <br />1. STATE: Consult with Division engineers and State personnel to determine changes in water <br />right administration or operational procedures since the Phase II modeling effort, Develop <br />modifications to the Phase II assumptions and explain those in a brief memo, , <br />2. RTIWR: Modify the Phase II STATEMOD input files to reflect the Phase II assumptions <br />in operational procedure, <br />3, Update the Phase II documentation of the baseline data set for any changes to the explicitly <br />operating structures, If Phase III baseline data operation of the explicitly operated structures <br />is not changed from Phase II, the State will be notified of this and there will be no further <br />formal documentation of the baseline scenario data set. <br /> <br />Deliverables: <br />L Memo describing modifications made to Phase II baseline scenario, <br />2. Updated Statemod input files reflecting revised baseline scenario. <br />3, If appropriate, updated documentation of baseline data set. <br /> <br />Subtask 2.16 <br /> <br />Prepare Final Documentation <br /> <br />Objective: <br /> <br />Prepare a final engineering report in hard copy, which, when approved will be loaded <br />onto the CRDSS system for on-line access, <br /> <br />Assumptions: <br /> <br />The formal and final engineering report will use as a base the draft chapters prepared <br />by the State for the data preparation subtasks, It is assumed that the Phase II data <br />preparation chapters will be left intact and supplemented by the Phase III aggregation <br />concept. The calibration section of the final report will involve the full replacement <br />of the associated sections in the Phase II reports with Phase III methodology and <br />results, No on-line presentation of engineering notes is required. On-line presentation <br />of the formal engineering report will not be required until that written product is <br />approved by the State, <br /> <br />1057 <br /> <br />For the White River Basin, prepare the final documentation, As the activities for each <br />subtask are performed, a written draft chapter describing the process and results will <br />be prepared by the consultant and submitted to the State, Significant Irevisions to the <br />process of the subtask will cause a regeneration of the written draft chapters and <br />resubmittal to the State, <br /> <br />It is assumed that all word processing required to generate the final report will be <br />accomplished at and by the State except for the calibration graphics and tables which <br />will be the responsibility of the consultant. <br /> <br />Approach: <br />I. State: Prepare a draft Engineering report to the State, following the same organization that <br />was used for the Phase II Engineering Reports: <br />I. Executive Summary <br />II. Introduction <br /> <br />Phase IlIa Scope of Services <br /> <br />A-23 <br /> <br />June 12, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.