Laserfiche WebLink
<br />~~ ~ <br />1. STATE: Identify diversions in the White River Basin which are tie to irrigated land but ~ <br />have no location, Define locations for these headgates. Updat the CROSS Arclnfo <br />formatted file of "Diversions" to include these structures, _ <br />STATE: Modify Statemod to allow reports r \d' .a r eled in / <br />a given simulation. Run this option with the ,se hite River .dds file, .---I <br />RTIWR: Defme locations for all b~,~~ contained in the Phase IT White River Basin / <br />ModeL Prepare a location file for these suitable for import into an ARCVIEW file, .---J <br />RTIGIS: Set up a project in ARCVIEW (SGI version) with the following elements: <br />River Basins (with White River Basin differentiated by color from other basins) <br />500K hydrology <br />The table of Phase II modeled structures created above should be imported into the <br />project file, <br />Irrigated lands for the White River Basin (showing only cropland (types 1-9) with ./ <br />irrigation flag), The irrigated land table should be joined to table of Phase II modeled <br />irrigation structures, and used to color differentiate Phase II lands from other lands. <br />"Diversions" (this table should be joined to the irrigated land table so as to only plot <br />those structures tied to irrigated lands and joined to the table of Phase II modeled <br />irrigation structures to allow one to color differentiate Phase II diversions from other <br />lands,) <br />The location table of Phase IT base flow nodes created by the state should be imported <br />into ARC VIEW and used to plot these locations, <br />This project file and any associated files should be placed on cando at the conclusion of this <br /> <br />;~~are a ARCVIEW layout of the above map layers. prepar~ by 4~h map using <br />the layout. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br /> <br />5. <br /> <br />1069 <br /> <br /> <br />~ <br /> <br />7 <br /> <br />v <br />/ <br />V <br /> <br />v <br /> <br />Deliverables: <br />1, A revised "diversions' file containing all locations of White River diversion structures tied <br />to White River irrigated lands. <br />2. A list of structures modeled in Phase II. <br />3. A me of Phase IT baseflow node locations in a format suitable for import into ARCVIEW, <br />4. A ARCVIEW project file with the layers indicated in 3. above. <br />5. A 36 by 48 inch map generated from ARCVIEW. <br /> <br />Subtask 2.03 <br /> <br />Objective: <br /> <br />Aggregate Irrigation Structures <br /> <br />f(;;,' I}";o <br /> <br />For the White River Basin physically aggregate the irrigation structures not explicitly <br />modeled in Phase II by' manuallv drawinl! al!l!Tel!ation boundaries on the map. All <br />irrigation structures falling within a boundary will be aggregated into a single <br />structure. A table will be l!enerated from ARC/INFO listing the individual WorDs <br />associated with each aggregation ooundary. <br /> <br />Phase IlIa Scope of Services <br /> <br />A-ll <br /> <br />June 12, 1996 <br /> <br />