<br />
<br />o
<br />"}
<br />U'
<br />
<br />'.
<br />
<br />...,
<br />III
<br />
<br />)
<br />
<br />
<br />"
<br />,
<br />
<br />TABLE A
<br />
<br />Estimated Structural Cost Distribution
<br />
<br />Upper and L~r Saguache Creek Watersheds, Colorado
<br />
<br />.
<br />
<br /> Installation Cost PL 566 Installation Cost - Other Funds otal
<br /> Construc- Eng1 Total Construc- Land Water Total nstallat;
<br />Item tion neeY'ing PL 566 tion Ri"hts Rights Other :Ost
<br />Storage Reservoir 1,072 ,500 300,300 1,372 ,800 1,072 ,500 305,000 20,000 1,397,500 ,770,300
<br />Canal Rehabilitation 375,000 105,000 1180,000 375,000 375,000 855,000
<br />Subtotal 1,11117,500 405,300 1,852,800 1,447,500 305,000 20,000 1,772 ,500
<br />Project Administration 1163,200 29,000 1192,.
<br />Grand Total 1,1147,500 405,300 2,316,000 1,1147,500 305,000 20,000 1,801,500 ,117,500
<br />
|