My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02842
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:32:47 AM
Creation date
10/9/2006 3:35:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grand Basin-Rio Grand River Basin Water Projects-San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
6/1/1940
Author
RJ Tipton
Title
Rio Grande Basin-Colorado-San Luis Valley-Status of the San Luis Valley Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br />f-..: <br />a...: <br />00 <br />ZO <br />o <br />oJ <br />",' <br />of- <br />en <br />f-" <br /><" <br />" <br />",< <br />o,g <br />Z <br /><>- <br />aoJ <br />"" <br />., <br />o <br /> <br />a <br /> <br /> <br />1; 00 <br /> <br />300 <br /> <br />100 <br /> <br />" <br /> <br />ASSUME.O NET IRRIGATION <br />DEMAND ON THE WATER SUPPLY <br />AT DEL NDRTE ( 161,000 AT) <br /> <br />MEAN WATER <br />:" SUPPLY (143,IOOA.r) <br /> <br />100 <br /> <br />o <br /> <br />o <br />'" <br />00 <br /> <br />~ <br />~ <br />~ <br />~ <br /> <br />o <br />o <br />'" <br /> <br />o <br />'" <br /> <br />o <br />'" <br />'" <br /> <br />o <br />'" <br />'" <br /> <br /><Xl <br />.., <br />'" <br /> <br />Y(AR <br /> <br />1;00 <br /> <br />W <br />f- <br />a..: <br />3000...: <br />Zo <br />o <br />oJo <br />w- <br />0' <br />f- <br />f-en <br />200 ..." <br />" <br />.." <br />0< <br />z~ <br />< <br />a>- <br />oJ <br />100 "" <br />0" <br /> <br />a <br /> <br />o <br /> <br />{:lIO GAANOE W,4TER USERS ASSOCIATION <br />,t;I oJ. TIPTON, CONSULTING CNOIN!ER <br />SAN LUIS VJIILLEY PROJECT <br />WATER SUPPLY vs,ASSUMED <br />DEMAND AT DEL NORTE <br />JULY AND AUGUST <br /> <br />DRAWN Q ".-JT. <br />TRACED 0 1'1, ,4PPRQV!O <br />DENVfR,COl.O. ,JUNE 5, SL <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.