Laserfiche WebLink
<br />0022d7 <br /> <br />.:..P'?-E;-::-:":C ":---,..--- <br />Page.,.::~ <br /> <br />4th sentence: Questioning whether a 5241 per acre-foot increase impacts the economic <br />justification of the plant is irrelevant. As the report states, .the desalting plant was \ <br />selected because it was thought to be a 'permanent and definitive' solution. . . " not <br />because it was economically justified. <br /> <br />[NTRODUcnON <br /> <br />BACKGROUND <br /> <br />Pa,i1e 3. Para~ra,ph NO.1 <br /> <br />1st line: Change "desalination of Colorado River water" to .control the salinity of water <br />delivered to users in the United States and Mexico. . ... This is the lan~ai1e of the <br />&1. <br /> <br />Faile 3. Faral1raph No.2 <br /> <br />4th sentence: change "desalt" to "reduce the salinity of' <br /> <br />5th sentence: The report should note that in addition to constructing the desalting <br />plant, other methods have to some degree been implemented. Some Wellton-Mohawk <br />farmlands were retired from production, and all the drainage is diverted to the Santa <br />Clara Slough on an interim basis. <br /> <br />Pai1e 4. Para~aph NO.1 <br /> <br />1st sentence: Change "5155.5 million to complete the complex plus other defined <br />measures" to "UOO million to complete the desalt complex plus S55.5 million for other <br />defined measures." <br /> <br />,.~"";\ <br />l..j <br /> <br />2nd sentence: Change "help control" to "protect the United States rii1hts." <br /> <br />Pa\:e 4. Parai1raph No.2 <br /> <br />3rd sentence: The phrase "estimating errors in the original plan" should be changed to <br />"the preliminary nature of original estimates and design changes to incorporate state of <br />the an technology. . . ." <br /> <br />Page 5. FaraiTaph No.1 <br /> <br />2nd full sentence: This sentence is misleading as written. At the $485.5 million level. <br />the capacity of the plant has not decreased from 96 million gallons per day. If the plant <br />is not expanded from 73 million gallons per day, the total estimated cost will be less <br />than the S485,5 million level. <br /> <br />2 <br /> <br />/ <br /> <br />26 <br />