Laserfiche WebLink
<br />I <br /> <br />tJC.dti4 <br /> <br />EXHIBIT D (oontinued) <br /> <br />(5) Trails to Gneiss and Spillwa.y <br />Canyons and to river <br /> <br />600.00 <br /> <br />5000.00 <br />250.00 <br />250.00 <br />2500.00 <br /> <br />(6) Suspension Bridge <br />(7) Working space lower level <br />(8) 3arge moorings <br />(9) Laboratory and equipment <br /> <br />B-1 Dam Site Investigations <br /> <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />(8) <br /> <br />Contour map 5-ft. interval by FAS <br />Drilling of dam foundations <br />Drilling abuttments <br />Spillway Canyon bed: Gen. Routine) <br />Archean-Ta:peats Contaot: Routine ) <br />with (6) ) <br />Permeability; drilling program <br />Strength of rooks; Gen. Routine <br />Petrographio S'tudiesl Gen. Rou'ting <br />with U.S.B.M. Tu"on Station 00_ <br />.operating. <br /> <br />;000.00 <br />22000.00 <br />6600.00 <br /> <br />5500.00 <br /> <br />I <br /> <br />B-2 Transportation. <br />Preliminary investigations to submit bes't 2500.00 <br />and a1'terna'tive routes 'to oonstruction site <br /> <br />B-3 Materials of oonstruotion. <br />All general rou'tine in' field (and' laboratory) <br />with U of A and Ariz, Highway Lab., oooperating <br /> <br />B-4 Reservoir Site. <br />Contour map and similar data' as required 'by <br />the Federal Power CODllllission, 'by FAS 65000 .00 <br /> <br />B-5 Meteorological Studies. <br />Equipment to be furnished by Weather Bureau, <br />records part of general routine <br /> <br />LABOR AND SUPPLIES SCHEDULE <br /> <br /> <br />Labor, per month <br />Project Superintenden't <br />Clerk <br />Asst. Geologist <br />Geol. Helper <br />Draftmnan & Photog. <br />Laboratory Chief <br />Laboratory Helper <br />Cook <br />Storekeeper (Trans. Camp) <br />Truok Driver <br /> <br />450.00 <br />150.00 <br />175.00 <br />150.00 <br />125.00 <br />175.00 <br />100.00 <br />100.00 <br />125.00 <br />150 .00 <br /> <br />1700.00 <br /> <br />-6.. <br />