My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02498
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:19:32 AM
Creation date
10/9/2006 3:24:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.700
Description
Colorado River - Colorado River Basin - Colorado River Basin General Publications
State
CO
Basin
Colorado Mainstem
Date
1/1/3000
Author
Special Committee
Title
In the Matter of the Application of the State of Arizona to the Federal Power Commission for a Preliminary Permit at Bridge Canyon Arizona - Application for Preliminary Permit - Project No. 1503
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UlllJbJ <br /> <br />I <br /> <br />ElrnIBIT C <br /> <br />In 1926 the City of Los Angeles made an extensive survey O'f this <br />d.EulJ..site and the immediate vioinity. but we have been unsuooessful in <br />ob1laining any of their data. <br /> <br />Stroam measurements are taken from tho reoords of the Bureau of <br />Reolamation. Foundation explorations have not been made. but a <br />geologioal roconaissanoe of the site was made in 1937 by 11.. L. Flagg <br />for the Colorado River Commission of Arizona. and his report is <br />available. <br /> <br />The City of Los Angeles built 0. road from Milkweed Tanks to the <br />head of Bridge Canyon and a good trail from that point to the dam-site. <br />The road and trail are now in fair oondition and oould bo used with the <br />expenditure O'f a Ii tUe work. <br /> <br />EXHIBIT D <br /> <br /> <br />PRELIMINARY COST ESTIMATES <br /> <br />(A) Preparation for Investigations. <br /> <br />(1) 8 miles of road o.t $650 <br />(2) Transfer Camp, head of Bridge <br />Canyon <br />Warehouse 350.00 <br />Corral 50.00 <br />Tanks (water) 150.00 <br />Tent houses 250 .00 <br />Misol. Equip. 250.00 <br />Prepare site 200.00 <br /> <br />Piok-up truok <br /> <br />(3) <br />(4) <br /> <br />Trail to Gneiss Canyon Camp 7 mi. <br /> <br />Gneiss Canyon Camp <br />Preparation of site <br />Fuel storage <br />Corral <br />Water system <br />Light and power <br />Tent houses <br />Kitohen and equip. <br /> <br />Saddle an1ma.ls <br /> <br />500.00 <br /> <br /> <br />100.00 <br />50.00 <br />50.00 <br />325.00 <br />775.00 <br />900.00 <br />300.00 <br /> <br />-5- <br /> <br />5000.00 <br /> <br />1250,00 <br />1500.00 <br />1050.00 <br /> <br />3000,00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.