My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02244
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:17:49 AM
Creation date
10/9/2006 3:16:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1993
Author
BOR-NPS
Title
Legislation to Make BC a National Park-Scoping Report for the Gunnison River Contract
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER 3. SCOPE OF NEPA ANALYSIS <br /> <br />rnmmpnfl:: rp,('Pt"p,-i ~t thp. nnhlif'" (:("nnlno tnp.p.tinn~ '!:lInil in th"" lp.ttprc mill hp. lICP.r1 tn "prifv ~l!h~t <br />_____~_._.a._ a___.o__ -. ...- r--~- ~-~r~.t:l..._-,",.....t:l... -................ "'"".... ..........""...... ...................... .......-............ ._.~./ .._--~ <br />level of NEP A analysis is necessary (environmental assessment or ElS), to assist in fonnulating <br />alternatives, and to help detennine the affected environment, environmental consequences, <br />mitigation measures, and studies to be perfonned in the contract analysis and decision-making <br />processes. <br /> <br />The initial scoping effort identified many controversial issues and concerns to be addressed, <br />making it apparent that an ElS would probably need to be prepared. The following preliminary <br />outline for a draft NEP A document was developed to assist in ensuring that the issues and <br />concerns raised in this scoping effort are addressed as different sections of the NEP A document <br />are prepared. The number in parentheses following each section identifies the item under which <br />the comments are discussed in the next chapter. <br /> <br />Gunnison River Contract <br />Preliminary Outline for a NEPA Document <br /> <br />I. INTRODUCTION <br /> <br />A. 'Background <br />1. Historic and Current Operation of the Aspinall Unit (Item 1) <br />2. Aspinall Unit Purposes (Item 2) <br />3. Black Canyon and Curecanti Purposes and Resources (Item 3) <br />4. Gunnison Gorge Resources (Item 4) <br />5. Colorado's Interests (Item 5) <br />6. Endangered Fish (Item 6) <br /> <br />B. Purpose and Need ' <br /> <br />II. ALTERNATIVES <br /> <br />A. Fonnulation of Alternatives <br />1. Compatibility with Federal and State Laws (Item 7) <br />2. Accountability: Meet and Balance Goals (Item 8) <br />3. Release Priorities, Quantities, and Patterns (Item 9) <br />4. Colorado's Compact Entitlement (Item 10) <br /> <br />B. Alternatives Considered (Item 11) <br /> <br />C. Comparative Analysis (Item 12) <br /> <br />9 <br /> <br />0',/'.:'''''''" <br />(~!:: '.:}~' <br />
The URL can be used to link to this page
Your browser does not support the video tag.