My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02241
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:17:47 AM
Creation date
10/9/2006 3:15:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies - General Water Studies
State
CO
Basin
Statewide
Date
5/3/1979
Author
R A Young J R McKean
Title
High Plains Study - Detailed Plan of Study - Ogallala High Plains Aquifer Study - With Element Breakdowns
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Uigh Plains Study <br />Page seven <br /> <br />Energy Prices <br /> <br />OO1l259 <br /> <br />Energy prices will be included in the demand forecas ting analysis. The general <br />contractor will provide a forecast of "orld/D" S. energy prices (crude oil) by <br />October 15, 1979. Economic and financial projections should be expressed in <br />constant (most likely 1978) dollars with a zero rate of inflation. The base year <br />has not yet been chosen, OEC will also provide the contractor with historical <br />electricity prices for the past ten years by end-use category: residential, <br />commercial, industrial, and agricultural, These prices will include a <br />projection of prices regionally to reflect varinti.ons in rate structures (or <br />the Colorado portion of the Wigh Plains area, <br /> <br />Energy Technologies <br /> <br />Evaluation and summarization of any known reports or reseilrch and demonstration <br />project~ on potential neW' energy supply technologies \,,111 be provided which ,-1ssess <br />the feasibility of developing and applying innovative or alternative energy supply <br />technologies in Colorado, <br /> <br />Key Elements of A-2 <br /> <br />The nbovc c1cscriptiClIlS olltl:ilH~ the c.:lement t':lskG of A-2. '1'11(: i.nclude: <br /> <br />A-2,1 <br />^-2,2 <br />1\-2.3 <br /> <br />A-2,4 <br />1\-2,5 <br /> <br />A-2,6 <br /> <br />Identify and review stnte energy data sources <br /> <br />Revie.w energy d.1:ta speci.ficntiollS <br /> <br />Determine method of satisfying the specification with the <br />General Contractor <br /> <br />Identify/develop method of 'projecting energy data time profiles <br /> <br />Project energy data profiles as required by the specification <br /> <br />Compile data, prcp<.lre report, and forward to the <br />General Contractor, <br /> <br />These elements do not include the modeling of alternative scenarios, The attachecl <br />budget is for twelve (12) months. Hopefully, this will be adequate to perform <br />the .1ddjt:i.on,,]] :111'-:I1.y::dS. A!; mcnti01li:d ;)b()vl-~, (me may submit: [or fHI()pJemcnt.:tl <br />appropriations of the time frame and funding is inadequate. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.