Laserfiche WebLink
<br />_ r :'j ""t""\.. <br />~\)\lv <br /> <br />Although TV A and CADSWES will be responsible for major model development efforts, the <br />guidance of consultants will be required to address specific elements of the PRSYM model <br />and analysis tools, including the link to power system economics, the water quality module, <br />and multi-objective evaluation and tradeoff analysis. <br /> <br />It is required that TV A, the Subcontractor, and consultants work closely together on the <br />development and implementation of the modeling system. Consultant's work will be <br />integrated into the detailed project design plans developed by TV A and CADSWES. TV A <br />personnel must be trained on the technical aspects and application of PRSYM. It is expected <br />that TV A staff and consultants will spend time at the Subcontractor's facility during the <br />model development phase and that the Subcontractor will assist in the on-line implementation <br />at TV A facilities. The Subcontractor will also assist in the implementation of the DSS and <br />modeling systems at a second utility (under a separate contract). <br /> <br />S-5 <br />