Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3 <br /> <br />At the beginning of the project it was felt that private land ownera <br />should provide field drops to accommodate their waste water. When <br />additional money became available the District decided to include <br />field drains in the scope of the project and approximately 50 vere <br />installed by the contractor, as vere six additional vehicle crossing <br />structures. <br /> <br />3. <br /> <br />Costs <br /> <br />Cost. are shown by item and by locstion on the next three pages. It <br />is difficult to assign a value to the time, energy and effort spent <br />by members of the Board of Directors. Three members, Robert C. Taylor, <br />Dale Sowards and Kelly Sowards, vere appointed as a committee to <br />handle urgent items of business vhich came up between regular meetings <br />of the Board of Directors. and much delll8nd was IMde on their time. <br />pa rti cula r ly . <br /> <br />Legal, administrative and engineering costs are approximate as other <br />studies, projects and functions vere being carried on concurrently <br />and a distinct division between projects is impossible to make. A <br />further breakdown of engineering costs is given below: <br /> <br />Preliminary feasibility study $ 1.469 <br />Field survey for and preparation of filing map 1.590 <br />Design and preparation of plans and specifications 5,334 <br />Revisions. bidding, calculations for new profile 2,536 <br />Surveys and calculations for rights of way 2,484 <br />Construction staking and route changes 2,297 <br />Construction supervision and inspection and reports 3.150 <br /> <br />Total Engineering Costs $18,860 <br /> <br />Legal costs are distributed over the various phases of the project <br />as followe: <br /> <br />Right of way acquisition <br />Contracts <br />Contacts and confsrences for refinancing of <br />project <br />All other related matters <br /> <br />Total Legal Costs <br /> <br />1.538 <br />300 <br /> <br />331 <br />469 <br />. 2.638 <br /> <br />Funds, other than those of the District, came from the following <br />sources: <br /> <br />A.B,C.S. initial grant <br />A.B.C.B. supplemental grant <br /> <br />Total A.B.C.S. Grants <br /> <br />Colorado Water Conservation Board <br />Initial grant <br />Supplemental grant <br /> <br />Total state Grants <br /> <br />$ 84.000.00 <br />55,000.00 <br /> <br />$139.000.00 <br /> <br />~ <br />. <br /> <br />25,000.00 <br />20,000.00 <br /> <br />0569 <br /> <br />$ 45.000.00 <br />