My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02002
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:04:37 AM
Creation date
10/9/2006 3:07:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.750
Description
Colorado River-Salinity Projects and Issues Located in Colorado-Mancos Valley
State
CO
Water Division
5
Date
1/28/1941
Author
BOR
Title
The Mancos Project-Excerpt from Senate Document No 18-77th Congress 1st Session Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0'311 <br /> <br />-7- <br /> <br /> <br />5. Examine and approve tenure arrangenents. a,dequaoy. and oondition <br />of home and farmstead buildings and other struotures. and the oondi- <br />tion and ability of land to llBet debt and rent payments and provide <br />a decent living for the tenant families. With approximately 43 per- <br />oent of the lend under this project operated ,.by tenants tba need for <br />this servioe is apparent. It is reoommended that delivery of storage <br />water to tenant-operated units be conditional upon this approval. <br />I understand that water will not be delhered for use upon lands of <br />one owner in ,exoess of an adequate siZed unit. Excess lands to be <br />eligible for the delivery tlf water must be sold at not to exoeed the <br />GoveJ'1llD8nt appraised price, end in -the event that the owner of' ex- <br />oess lands has a water right whioh plrtially sstisfies his needs for <br />an adequate-sized um:t. he will be delivered only suffioient addi- <br />tional water to fully satisfy his needs upon bis specifioally desigXJat- <br />ad unit. <br /> <br />"- <br /> <br />Af'\:;er oomplstion of eonstruction. a development period ot'savere1 years <br />will he neoessary 1:0 oomplete unit reorganillation end organille and stabilille <br />produotion before returns will perm1t repayment of oonstruct1cn oosts. <br /> <br />;Juring this period. use and distribution of water should be carefully <br />eupervised. The Department of Agriculture will maintain supervision of <br />operatiuna of flU'1l1 borrowers tbrough its rehabilitation program. Supervision <br />of' use and distribution of' water oan well be consolidated with t'nrm super- <br />visilmJ hems the Deplrtment of Agrioulture is vdll1n& to asmme this res- <br />ponsibili ty. <br /> <br />OUr estimates indioate t!et the Deplrtmant of Agrioulture will require <br />approximately $80.000 for its partioipation. in addition to a WOl'k projeots <br />Adminie-tration oontributian of' approxi:ately 1145.000. These funis WllUldlB <br />upd primarily for field investigations and surveys and planning fur the <br />entire projeot and for land d011elopment of not more tha:n 2.000 aores whioh <br />might be purobased to effeot unit reorganizations. <br /> <br />Sinoerely yours. <br /> <br />/s/ Paul H. Appleby <br />Aoting seoretary <br /> <br />"'~ <br />:>> <br />
The URL can be used to link to this page
Your browser does not support the video tag.