My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01956
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:30 AM
Creation date
10/9/2006 3:06:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8408
Description
River Basin General Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1991
Title
Platte River Evaluation: USBR - Platte River Evaluation Update - Publication
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />(t'1'~r<r <br />UL l V 't <br />-.- <br />'1\ <br /> <br /> <br />.-. <br /> <br />:; <br /> <br />II <br /> <br />~- <br /> <br />," <br /> <br />,..... <br /> <br />Platte River Evaluation <br />UPDATE <br /> <br />Bureau of Reclamallon E....lu.Uon of lhe Operation of EJ.laling Projects on the <br />Plan. Rivet for the Potential to Affect Thre.l.ned or Endangered Specl.s_ <br /> <br />j <br /> <br />CktolM.>r 1991 <br /> <br />North Plan. River Projects Office, Milia, Wyoming <br /> <br /> <br />- <br /> <br />.- <br />......-::I _ & ~,~ <br />- liIS" <br />~ -.',,+tl - ";', <br />.,~~ <br />,.. ,-'''i . <br />'"~,_\ <br /> <br />Aerial \'jew of SeminOt' Dam and Resavoiroll the NOr1h Platte Ril"U <br /> <br />Stud)" Team Actj,.ities <br /> <br />The Hydrology Study Team <br />leader held the third learn meeting <br />AugU.'>1 13- H at the Nonh Plane River <br />Projects Office in M ills., Wyoming. <br />Team leader Duane Woodward in. <br />ilialcd the ml:cling by restating that <br />the role (If the llydrology Study Team <br />is to: <br /> <br />1. PrO\idc cxpcrlisc on the Jal:l <br />and methods used to develop the <br />Plane River waler opc=ration analys;~. <br /> <br />2. Review and comment on the <br />hydrology analysis and work products. <br /> <br />3. Keep their COn5.tiluency in. <br />f~lrmed regarding the progress. and <br />scope of the hydrology modeling <br />efforts. <br /> <br />The Study Te;tm's main focus at <br />lhislimc is on Rcdamatinn'~ ul'vclop. <br />;e~l of-aNoflh Plane Ri..f"r <br />hvdrologic model. to he used in a~\css' <br />~g threatened and endangered <br />species use of the Platte River. Major <br />hydrology work tash for developing <br />the Plalle River water operation <br />analysis include: <br /> <br />. developing present wndition <br />water supplies; <br /> <br />. developing present conditilln <br />demands; <br /> <br />. dc\'eloping a South Plalle River <br />hydrologic model: <br /> <br />. updating the ccnlral Platte Ri\'er <br />hy'drologic model. <br /> <br />The Study Team agreed the <br />operational ru.~off !>ludy-pcriod to Qt: <br />evaluated .....ould be 1930 10 1989. Dis- <br />plays of long-term precipitation <br />trcnd.". annual runoff ahove Path- <br />(ind<:r Reservi}ir and tree ring infor. <br />mJ.lion werc rcvicwed to determine <br />the study period 10 be used in the <br />watcr operation analysis. <br /> <br />The Sludy Team has reviewed <br />the North PlaUt,; River Simulation <br />\lnJd. a.~rnndified by Reclamation <br />Jpring Seminoc Dam_ studies, and the <br />computalional steps it performs to <br />simulate the water supply and delivery <br />(lpcralinns of the North Plane River. <br />As part of the re\iew. comparisons <br />were made hetween the original <br />model and the modified model. <br /> <br />The Study Team's re\iew of the: <br />model's reservoir operations, nalural <br />flow/storage flow accounting. and <br />storage o"'-nership accounting raised a <br />numher of que!-lions and hi~hlighted <br />computations to Ix checked or pos!>i- <br />hly modified prior to inclusion in lhe <br />team model. Reclamati~m is keeping <br />a [i_~l of the questions and chech that <br />need to be made a!> a reference for <br />developing the North PlaUt: River <br />Water Utili/ation model. <br /> <br />The Study Team has discussed <br />the process for calibraling model!>. <br />Calibrating ....ilJ he accomplished by <br />comparing model resulls to a recent <br />period of hiSloric dala!>o model <br />refinemenls can he determined and <br />made. Verif)ing and (csting thc <br /> <br />(COfl/'d) <br />
The URL can be used to link to this page
Your browser does not support the video tag.