Laserfiche WebLink
<br />I <br /> <br />SEP-14-1994 1S:15 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.04 <br /> <br />~ <br /> <br />I . <br /> <br />. Some preliminary testing has taken place. Additional testing will take place, and this task <br />should be finished on time. This task is 10% complete. <br /> <br />10. Prepare Task Memoranda (May 29 -January I; revised to May 29 - December 15) <br /> <br />. Some work has been done in draft form. and this task should continue until the end of the <br />project. <br /> <br />TASK 1.07- Physical Database Development (May 8 - January 1; revised to May 8 - <br />December 15) <br /> <br />1. Finalize Data Requirements (May 8 - November 27) <br /> <br />. This task is on schedule. The monthly progress report includes detailed tables showing the <br />individual data types. This task is at least 95% complete. <br /> <br />2. Review Database Design (May 8 - June 26) <br /> <br />. A version of the database is already implemented. <br /> <br />3. Populate Database (May g - November 27) <br /> <br />. This task is on schedule. The monthly progress report includes detailed tables showing the <br />population of individual data iypes. This task is at least 90% complete. <br /> <br />4. Develop Data Access Procedures (May 29 - October 30) <br /> <br />. The access to the database has been evaluated. The development of the OM! software (and <br />access procedures) has changed with RTi coordinating the low-level OM! work. Until that <br />work is completed, additional work on DMI software development cannot take place. <br />Depending on the development of the low-level DMls, this task may be delayed. The task <br />will most likely not be delayed past the middle of November. <br /> <br />5. Test Database Prototype (October 2 - January 1; revised to July 5 . December 15) <br /> <br />. Some testing has taken place. Additional testing will take place. This taSk should be fInished <br />on time. This taSk is 70% complete. <br /> <br />6. Prepare Task Memorandum (May 29 -January I; reyised to May 29 - December 15) <br /> <br />. Some work has been done in draft form. and this task shelUld conrinue until the end of the <br />project. <br /> <br />1.'511 <br /> <br />A,z7.$CJ9,1lIl <br /> <br />3 <br />