My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01895
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:05 AM
Creation date
10/9/2006 3:04:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/14/1994
Title
Project Management-CRDSS Year 1 Tasks and Subtasks-Summary
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />SEP-14-1994 1S:15 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.04 <br /> <br />~ <br /> <br />I . <br /> <br />. Some preliminary testing has taken place. Additional testing will take place, and this task <br />should be finished on time. This task is 10% complete. <br /> <br />10. Prepare Task Memoranda (May 29 -January I; revised to May 29 - December 15) <br /> <br />. Some work has been done in draft form. and this task should continue until the end of the <br />project. <br /> <br />TASK 1.07- Physical Database Development (May 8 - January 1; revised to May 8 - <br />December 15) <br /> <br />1. Finalize Data Requirements (May 8 - November 27) <br /> <br />. This task is on schedule. The monthly progress report includes detailed tables showing the <br />individual data types. This task is at least 95% complete. <br /> <br />2. Review Database Design (May 8 - June 26) <br /> <br />. A version of the database is already implemented. <br /> <br />3. Populate Database (May g - November 27) <br /> <br />. This task is on schedule. The monthly progress report includes detailed tables showing the <br />population of individual data iypes. This task is at least 90% complete. <br /> <br />4. Develop Data Access Procedures (May 29 - October 30) <br /> <br />. The access to the database has been evaluated. The development of the OM! software (and <br />access procedures) has changed with RTi coordinating the low-level OM! work. Until that <br />work is completed, additional work on DMI software development cannot take place. <br />Depending on the development of the low-level DMls, this task may be delayed. The task <br />will most likely not be delayed past the middle of November. <br /> <br />5. Test Database Prototype (October 2 - January 1; revised to July 5 . December 15) <br /> <br />. Some testing has taken place. Additional testing will take place. This taSk should be fInished <br />on time. This taSk is 70% complete. <br /> <br />6. Prepare Task Memorandum (May 29 -January I; reyised to May 29 - December 15) <br /> <br />. Some work has been done in draft form. and this task shelUld conrinue until the end of the <br />project. <br /> <br />1.'511 <br /> <br />A,z7.$CJ9,1lIl <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.