My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01704
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:13:40 AM
Creation date
10/9/2006 2:56:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
5000.375
Description
Flood Protection Section - Alamosa - Rio Grande Flood
State
CO
Basin
Rio Grande
Water Division
3
Date
8/8/1985
Author
CWCB - DODES
Title
Report on the Findings of a State Damage Survey Team on the Rio Grande Flood of June 8-14 1985 - Rio Grande and Alamosa Counties - Colorado - CWCB - DODES - Second Preliminary Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002144 <br /> <br />[ <br /> <br />However, due to very limited head avai lable ,on the <br />upstream side, a major (100 foot span) structure would be <br />required to improve conveyance. A minor structure, ,such as <br />a metal or concrete box culvert, would be ineffective. <br /> <br />Cost Estimates: <br /> <br />To clean the existing bridge openings <br />and remove willows <br /> <br />!? 10,000 <br />$500,000 <br /> <br />To construct major conveyance structure <br /> <br />rating <br /> <br />RecollUnendation: <br />5-b.J1e-- <br />The~Kighway ~epartment should be requested <br />curve for the U.S. Highway 285 bridge. <br /> <br />to furnish a <br /> <br />--------- <br /> <br />The mud and debris which has accumulated under the <br />bridge should be removed to increase its conveyance capacity. <br />consideration should be given to removing willows in the <br />channel for a distance of 500 feet upstream and 500 feet <br />downstream of the bridge. <br /> <br />An inflow outflow analysis should be made ',by the <br />Highway department to determine what additional conveyance, if <br />any, is retjuired to establish a balance between maintaining <br />valley storage and improving flow. <br /> <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.