Laserfiche WebLink
<br />I <br /> <br />001775 <br /> <br />TERRY A. BOWEN [Continued) <br /> <br />Environmental 1m act Report, Public Service Electric and Gas Com an , <br />ur lngton enera lng atlon; or aCl lC Nort est La orato~: repared <br />and wrote the sectlons on the impacts on surface and ground water <br />resources of the solid and liquid wastes resulting from the proposed <br />oil-to-coal fuel conversion of a steam-electric generating plant.. 9/81 <br /> <br />Environmental 1m act Re ort, Atlantic Cit Electric Com any, Dee water <br />eneratlng Statlon; or Pacl lC Northwest La orato~: Prepar an wrote <br />the sectlons on the impacts on surface and ground water resources of the <br />solid and liquid wastes resulting from the proposed oil-to-coal fuel <br />conversion of a steam-electric generating plant. 9/81 <br /> <br />Preliminary Draft Environmental Impact Report, Public Service Electric and <br />Gas Company, Bergen Generating Station; for Pacific Northwest Laborato~: <br />Preparea and wrote the sectlons on the impacts on surface and ground water <br />resources of the solid and liquid wastes resulting from the proposed <br />oil-to-coal fuel conversion of a steam-electric generating plant, 9/81 <br /> <br />Assessment of the Clear Creek. Texas Flood Control Project; for the U.S. <br />Army Corps of Engineers: Responslble for the collection and analysis of <br />the hydrologic, geologic. and water quality data to develop the water re- <br />sources baseline and to evaluate the impacts of the five alternative f1 ood <br />control measures on the water resources of the Clear Creek basin, 3/81 <br /> <br />tIS for Fossil Fuel-Fired Steam-Electric Generating Plant at Cross. South <br />Carolina; for the Federal Energy Regul ato~ Commi ssion: Evaluated the <br />water quality and use information in the environmental impact assessment <br />and prepared the water resources baseline and impacts sections for the <br />EIS. 9/80 <br /> <br />Environmental Impact of Five Power Plants on the Coastal Environment of <br />Venezuela; for INELMECA, Venezuela: Analyzed offshore hydrologic data and <br />prepared the baseline.description, 4/79 <br /> <br />Environmental Impact Assessment of Two Coal-Fired Electric Generating <br />unlts; tor tne ~ 10rlda Power and Llght Co.: Transcrlbed anC! organlZed the <br />baseline data into a format suitable for evaluation. 3/79 <br /> <br />Water and Wastewater Management <br /> <br />Review and Evaluation of Red Water Marketability and Disposal Options; for <br />tne u.~. Army ARRAU~UM, uover, New Jersey: ProJect leader and author of a <br />technical and economic report on the state-of-the-art for marketability <br />and disposal options for red water waste produced during TNT manufacture <br />8/82 . <br />