My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01582
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:48 AM
Creation date
10/9/2006 2:50:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1971
Author
Unknown
Title
San Luis Valley Project Closed Basin Division - 1970-1971 - Reevaluation Statement - Closed Basin Division, San Luis Valley Project, Colorado, April 1971
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.: . 000341 <br />, . <br /> <br />. <br /> <br />. <br /> <br />Table 3. Summary of estimated annual henefi ts <br /> <br />Item <br /> <br />Primary Denefi ts <br /> <br />Total !lencfi ts <br /> <br />Water salvage <br />Recrea tion <br />Fish and wildlife <br />Area redevelopment <br /> <br />$1,074,000 <br />103,000 <br />68,000 <br />71,000 <br /> <br />$1,843,000 <br />103,000 <br />68,000 <br />71,000 <br /> <br />Total <br /> <br />$1,3]6,000 <br /> <br />$2,085,000 <br /> <br />Project investment costs. Investment costs of the project <br />are derived in tahle 4 as follO\~s: <br /> <br />Table 4. Federal investment costs <br /> <br />Cons truction cost <br />Less preauthori zation costs <br /> <br />17,027,000 <br />310,000 <br /> <br />Subtotal <br /> <br />16,717,000 <br /> <br />Interest during construction y . <br /> <br />528,000 <br /> <br />Net Federal investment <br /> <br />17,245,000 <br /> <br />Y !lased on Control Schedule, Form PF-2. <br /> <br />Net Federal investment costs shown in table 4 are discounted for stage <br />construction, resulting in an adjusted net Federal investment cost <br />of $15,671,000. Project operation., maintenance, and replacement <br />costs estimated at $229,000 annually arc also discounted for stage <br />cons truction, resulting in an annual O~I&R cost of $179,000. The <br />annual project costs, adjusted for stage construction, are presented <br />in table 5. <br /> <br />Table 5. Annual e.conomic project costs <br /> <br />Economic capital costs <br />Project C\'I&R cost <br /> <br />. <br /> <br />$809,000 <br />179,000 <br /> <br />San Luis Lake OI-l&R cos ts: <br />Basic recreational 'facilities <br />Fishing facilities <br />Mishak National NildlIfe Refuge o.\I&R <br /> <br />46,000 <br />(45,000) <br />(1,000) <br />48,000 <br /> <br />- - . ..~. "~~"-" .. <br />--- ..-.-...--.....--.---"" <br /> <br />. Total annual economic cost <br /> <br />$1;082,000 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.