Laserfiche WebLink
<br /> <br />. . <br /> <br />// <br /> <br />------------- <br /> <br />o.aO~33 <br /> <br />. <br /> <br />. <br /> <br />Table 2. Project Construction Costs y <br />(dollars) <br /> <br />Water salvage features <br /> <br />H.D. 91-369 <br />Reevaluation <br />Hay 1970 <br /> <br />$5,'795,000 2/ <br />1,970,000 - <br />1,796,000 <br />1,501,000 <br />1,279,000 <br />1,708,000 <br />532,000 Y <br /> <br />Reevaluation <br />April 1971 <br /> <br />$6,766,000 2/ <br />2,284,000 - <br />2,138,000 <br />1,773,000 <br />1,522,000 <br />1,940,000 <br />604,600 3/ <br /> <br />Y <br /> <br />$17,027,000 <br /> <br />- .'~,..'- ..... <br />"~"--"-_.'-"--'-'- ---- <br /> <br />Stage 1 <br />Stage 2 <br />Stage 3 <br />Stage 4 <br />Stagc. 5 <br />~Iishak National IHldlife Refuge <br />San Luis Lake Recreation Fad li ties <br />sCven additional wells and <br />related facilities <br /> <br />350,000 <br /> <br />Total cost <br /> <br />~$14,931,OOO <br /> <br />1/ Includes $310,000 preauthorization investigation costs. <br />Y Includes the right-of-\1ay costs for Hater salvage features of the <br />fi ve stages. <br />}j Inc ludes $30,000 for fishing <.fad li ties at San Luis Lake for <br />H. D. 91-369 and $32,000 for April 1971 reevaluation. <br />j,,/ Costs distrihuted to each stage in accordance \;1th May 12, 1970, <br />letter from Chief Engineer, Subject: Estimated costs for <br />additional Hells - Closed Basin Division - San Luis Valley Project, <br />Colorado. <br /> <br />Plan of Development <br /> <br />To provide for sufficient capacity to pump an average of 85,600 acre- <br />feet per year of groWld Hater, 1;1 th a reasonable a11.0\1ance for dO\-m- <br />time, the installation of 136 wells and pumping installations are <br />summari zed be 10\~: <br /> <br />Area No. of \~e 11s Size (inches) Depth Capad ty <br /> (ft.) (c.f.s.) <br />2 43 10 60 0.5 <br />3 8 16 100 3.5 <br />4 14 16 80 2.0 <br />5 25 10 100 1.0 <br />6 46 10 70 0.5 <br /> <br />3 <br />