My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01522
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:24 AM
Creation date
10/9/2006 2:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1996
Title
Boyle Contracts-Original-White River Basin Enhancement-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APR-24-1996 15:55 <br />I <br />I <br />I S~~ <br />~\ ;3. R1!i\V~; Docu~~t the deteIIDinatiOn. of return flow characteristics in a 1-2 page <br />t rn-8f__D~"iilto;.Jew. <br />. \ r b .14. RTiWR: IncoIpOrate State COlnments, (\I" - IT' <br /><v' . , 1\:\ "-' ~ ~ t-W \.. -<-<....:> $'--'-lt(?v-'f <br />'"" h6D !The Phase ill effort will not ehange the return flow pattems ar locations associat&1 with <br />; Phase II modeled structures. <br /> <br />FIU1' RlVERSlDE''TEOHl...OO'(dNC'. <br /> <br />10' <br /> <br />'.,' <br /> <br />1~'" P.06 <br /> <br />, <br />Delivei'able: <br />, <br />, <br /> <br />; . A memorandum documenting the lag patterns and return flow locations associated <br />; with each of the aggregated irrigation structures. <br />'. STATEMOD dJy and dds files repre.~ting assigned return flow characteristics for <br />the aggregated structures. <br /> <br />2.07. i Assign efficiency for aggregated irrigation Sll'Uctures <br />I <br />Objec1!ive: Assign and incorporate average monthly efficiency values for each aggregated <br />irriga~on structures. This task is 10 be accomplished through the following specific work tasks: <br /> <br />Appro~ch: <br />iL\'~6t- <br />13 ! 1. <br /> <br />~ <br />~~ '5 <br />'LP <br /> <br />!!f-t2. <br />s~ <br /> <br />RTiWR: RUD demandts using the Phase 11 STATEMOD input f1les to generate <br />the basin wide efficiency report. <br />RTiWR: Assign the Phase II demandts average monthly estimlLtes of basin... (\ <br />",o..IoI",-.0( <br />efficiency to the aggregated Sll'Uctmes within the Phaso ill dds file. <br />D-r.=J>~ Document the determination of monthly efficiency value... ill a 1-2 page <br />memo for review by the State. <br />RTijVR. ltJ.<;orporate State comments. <br />? V\.'\C ~"""";..... .- 2... \'Jr' <br /> <br /> <br />~ <br /> <br />DelivJrables: <br />; <br /> <br />:. A memorandum documenting the monthly efficiency associated with each of the <br />aggregated irrigation strucwres. <br />;. STATEMOD dds file representing the Phase II demandts average monthly estimates <br />: of basin efficiency at the aggregated structures, <br />: -W-:'1\~'"'" <br />2.08. ; Estimate aggregated~trocture demands and historic diveI1lions <br /> <br />Objeclive: Detemline the headgare demand time series (to be used in both the ddb and ddm <br />ftles) for each aggregated irrigation stroeture by running the consumptive use model (Blanney- <br />Criddle) und the demandts utility. This task is to be accomplished through the following specific <br />work ~asks: <br /> <br />Approach: <br />! <br /> <br />~ <br /> <br />OO~2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.