My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01522
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:24 AM
Creation date
10/9/2006 2:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1996
Title
Boyle Contracts-Original-White River Basin Enhancement-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A~b <br /> <br />.,RPR-3111-1996 <br />1 <br />I <br />I <br />I <br />I <br />I <br /> <br />5. <br />I <br />I <br /> <br />6. <br />7. <br />! 8. <br /> <br />DelivJrables: <br /> <br />12=31 <br /> <br />FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />1311138664474555 <br /> <br />P.12 <br /> <br />TO <br /> <br />demand time se . es. adjustment to base hydrology. It is noted that adjustments to <br />the Phase n cia set may be required. The time allocated to make calibration <br />adjustments wil not exceed 20 hours. If more than 20 hours are required for the <br />Phase ill callbr tion, a change order will be required for any additional <br />calibration. <br />RTiWR: Produ e the final visual comparisons (tables and graphs) for the <br />following seen . os: Phase m historic vs. Phase II historic, Phase ill historic vs. <br />gaged, and Ph m calculated vs. gaged. <br />State: Docume t the calibration process in a 4-6 page memorandum. <br />RTiWR: Revie memorandum. <br />State: Incocpor Ie consultant comments. <br /> <br />· State: A memoran m documenting the calibration process and results including the <br />minutes from the c 'bration meeting. <br />RTi WR: A set of S ! A TEMOD input Ii les (Historic and Calculated) which show a 20 <br />hour level of calibr tion effort. <br /> <br />I. <br />I <br />I <br />2,14. I Prepare baseline scenar 0 <br /> <br />ObjecJive: For the White Rver Basin, generate the ba~eline data files. A baseline scenario <br />data s~t will be prepared that re ect all input demand and operational data at a current level of <br />operations. The consultant w' adjust the baseline [0 reflect changes in operational data which <br />have ~come apparent since Ph IT. This task is to be accomplished through the following <br />SpeCifi work tasks: <br /> <br />i <br />Approach' <br />I . <br /> <br />! I. State: Consult with Division engineers and State personnel to determine changes in <br />I <br />i operalional procedu es since the Phase II modeling effort. . <br />12. R TiWR: Modify th Phase II ST A TEMOD input f1les to reflect the Phase lIt <br />I assumptions in oper tional procedure. <br />I <br />i <br />I <br />Deliverables: <br />I <br />I,. <br />I <br />I <br />! <br />j <br />2.1 S. I Prepare final document tion <br /> <br />Objec~ve: For the White ver Basin. prepare the final documentation. As the activities for <br />each s~btask are performed, a riuen draft ehapter describing the process and results will be <br />prepar~d by the consultant and 'ubmitted to the State. Significant revisions to the process of the <br />subtask will cause a regenerati n of the wriuen draft chapters and resubmittal to the State. The <br />I I <br />! I <br /> <br />I 00211 <br /> <br />RTiWR: A set fSTATEMOD input files (Baseline) which reflect current <br />operational proe dures in the ba~in. <br />
The URL can be used to link to this page
Your browser does not support the video tag.