Laserfiche WebLink
<br />,RPR-30-1996 12:29 FROM RIUERSIDE TECHNOLOGY.INC <br /> <br />TO <br /> <br />13038664474555 P.07 <br /> <br />i <br />I <br />I <br />I <br />Apprqach: <br />I <br />i <br />'1. <br /> <br />RTiWR: Prepare intermediate dds file for evcry structure tied to an irrigated parcel <br />(explicitly or aggre ated). <br />RTiWR: Run de dts in "crop" mode to get crop mix (.cds) for each strucrure in <br />the intermediate dd. file(!t wInne rhe State's respons1l5Ulty to 5Ul'Ply CountyM~ 1 <br />information at each structure. <br />RTiWR: Run the c nsumptive use model using the intermediate dds file to generate <br />an explicit consum tive use lime series for each structure using that structure's crop <br />mix. <br />RTiWR: Incocpora c demandts average monthly estimates of basin efficiency into !be PI', <br />command file forth white.dds prior to running demandts. \'- ~ ~(___ ,l k\ dilCl """''7 <br />S. RTiWR: Run dem dts in both "demand" and "diversion" mode using II command + ~ \ 1"- <br />file to generate the dh and ddm input files. The command file will illclude both the <br />explicitly modeled base 11 strUcrures as well as the aggregated groups indentified in <br />Phase III. The ddh de will incorporate headgate demands derived from consumptive <br />use estimates for th aggregated structures. <br />: 6. State: Document th determination of beadgate demand time series in a 1.2 page <br />memorandum for e' h of the aggregated structures. <br />: 7. RTiWR: Review morandum. <br />: 8. State: Incorpordte c nsultant comments. <br /> <br />i <br />, <br />: 2. <br /> <br />: 3. <br /> <br />'f--O <br />~~ <br /> <br />: 4. <br /> <br />Delive,ables: <br />, <br /> <br />'. RTiWR: A consum tive demand file (.ddc) for all the irrigation structures tied to <br />polygons in the W' River Basin. <br />: · RTiWR: ST A TEM D ddh and ddm input files. <br />; · RTiWR: ST A TEM )D dds file representing the Phase TI demandts average monthly <br />eSlimates of basin e lciency at the aggregated structures. <br />, · State: A memorand m documenting the headgate demand associated with each of the <br />aggregated irrigatio structures. <br /> <br />2.09. : Aggregate municipal an industrial demand/water right <br /> <br />Objective: To represent the depletive effect of those M&I users not modeled in Phase II. <br />Tlus t$k is to be aecomplished through the following specific work tasks: <br />I <br /> <br />ApproiK:h: <br />, <br />I <br />! <br />; I. RTiWR: Deter . ne the explicitly modeled water use (depletion) reflected in the <br />Phase 11 modeli g effort at all M&T structures on an aMual basis (12 values. one <br />for each month) or the White River Basin. This will be accomplished by I1lMing <br />STATEMOD 0 the Phase TI data.set to generate the xell report. <br /> <br />0027 <br />