My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01410
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:11:39 AM
Creation date
10/9/2006 2:46:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Colorado River-Colorado River Basin-Gunnison River General Publications-Corresp-Reports
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/14/1941
Author
F C Merriel
Title
Crested Butte Project-The Colorado River Water Conservation District-Project Investigations-Preliminary Report-Crested Butte Project-Gunnison County Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001301 <br /> <br />. <br /> <br />. <br /> <br />An attempt is said to have been made in 1934, 0. very dry year, <br />to blow up the low crib built by the town in the Lake Brennan outlet to <br />Anthracite Creek and release the stored water for irrigation in North <br />Fork valley in the vicinity of Paonio.. Later no. the result of a temporary <br />injunction granted the town against the Fire Mountain Canal Be Reservoir <br />Company, on agreement, embodi ed in a stipulation entered in the tri al of <br />the injunction suit, defined the rights of the town and of the canal end <br />reservoir company. <br />The right of the town to store wo.ter as in the past was modified <br />to prevent diversion by the town between May first and September fifteenth. <br />If either party took the initiative in enlarging the reservoir he must in- <br />stall an outlet on the Anthracite Creak eide, but the town agreed within <br />a specified time to install a good outlet on the Coal Creek side (which has <br />not been done). The town 6Breed to continue and complete its original plan <br />to reise the natural lake elvel by 2IJ feet within a specified time, or <br />forfeit its right to do so. The last of such dates for work by the town <br />(several dates ~ere set out in the stipulation and in subsequent proceed- <br />ings) was May 20, 1940, three years after the court order in the last gen- <br />eral ndjudi cation in Del to. County. <br />In this adjudication the present right of the town was recognized <br />by reason of the stipulation being included in the findings of the referee <br />and the order of the court, and is the only evidence of right the town now <br />has. The Fire Mountain Canal & Reservoir Company in the same adjudication <br />received two conditional decrees for enlarging Lake ~rennan, but nothing <br />has been done -to perfect rights under these decrees. <br /> <br />. <br /> <br />-f- <br />
The URL can be used to link to this page
Your browser does not support the video tag.