Laserfiche WebLink
<br />OOOB3 <br /> <br />iO <br /> <br />Slate lamls <br />Hights-oC-way for about 61,000 acres of Colorado State land must <br />be ncquired. The )lInn contemplates that t.hese will be made u,'nilable <br />nl no cost us the State's share in the cost of the project. Hights-of-wRY <br />for all Stale land required will be requested upon authorization of the <br />proj eel. <br />PrilJafe [awls <br />Tht:>se lands ,,,,-ill be aequired in stages, with the Ilcquisition at tlllV <br />one time limited to t.hat required for the pending 1itage constructiori, <br />exc-ept whe:re the ownerships in,"olved IIHtke desirable additional <br />llcquisition to nvoid having to deal more than one t.ime ,,,"itlt fl. single <br />owner. Acquisition will be initiated upon aVllihlbility of necessary <br />funds. <br />SUmmaM} oj land to bp acquired <br />Tubulated below is II sIIIllIlHU'," of Innd or rights to be ncquirerl by <br />types and purposes: . <br /> <br />Salvag!!area <br /> <br />Aru 01 lalld or righb 10 be acquired (acres) <br /> Slale <br />Fed!!ral (R.O.W.) Private Total <br />0 3,630 '.600 9,230 <br />0 1,360 8,430 1!'l,190 <br />0 16,000 1,12Q 23,120 <br />440 8.960 '.900 14,300 <br />0 20. no 1.370 21.850 <br />2.!'l60 2.480 13,880 18,920 <br />0 0 .00 400 <br />0 0 .00 400 <br />0 800 0 800 <br />0 1,640 6,360 8,000 <br />3.000 61,3~ 48.460 112,810 <br /> <br />2 (west 01 Colorado High....ay 17)...,___ . <br />2 (!!ulof IAlorado Highway 17) <br />3__...___..... ._ <br />4..........__..._...... <br />5.u...._......._........... <br />6_........................... ....-. <br />Main convtyance channel: <br />Slation 1311 to 670....... <br />Slation 670 to 247..... <br />San luis lake__ ...__._ <br />Mishak lakes Refuge... <br /> <br />Total... <br /> <br />Transmission system rights-of-way <br /> <br />Rights-of-way for tlw transmission lines shown all drawing 253-504- <br />1825 nnd nt'c('ssllry substntions, invoh'ill~ lands outside the wa.ter <br />sll.lnlge nn'u, \\"illlw acquired in iHlnlllce of construction of the trans- <br />mission lines, Such Ill'gotiutions will be integnlted with the ncquisition <br />of tilt' Federnl. Stute, nnd printte lands prc\'iousIy discussed. <br /> <br />PROJECT COSTS <br /> <br />Con~truct ion costs <br />Estimated construt'tioll costs of tht' project, bnsed on JamHln. 1963 <br />prices, lll'l' sUIllIllnrized in tnhle 1 und presented in lItbIc 2: basic <br />t':,;timate, DC-l summItry :;hrN. <br /> <br />T.\BI.E I.-E,~(imalrd conslrudi-01l CQ.~ts <br /> <br />t.:ttimGted <br />,'" <br />$:!, 213, 100 <br />1, 325, 200 <br />1, S4S, 700 <br />1,359,000 <br />1,027,000 <br />180,000 <br />I 414,000 <br />~. 370, 000 <br /> <br />W41tr,all'ogeJtaturo' <br />~tage 1__._____ ~_______ -_________ --- - --- - <br />:-itage 2__ _ _ __ _ _______ ._____ ___ ___ <br />Slagf'a__ _ ~_________ .------ <br />Stage 4___ _ _ _ _ _________ _ _ ____ _ .___ ______ .--.--- - -- <br />:-itagc 5__ _______ ______ _______ ___ ____ __ __ _ ___ ------ <br />:-,an Luis Lake f('cn:ationaI facilitjps__________._.____________ <br />.\li...hak Lake." Xational Wildlife Ih:fuge__ _ _ u____uu uu <br />Tot:11 cost. <br /> <br />I Docs not indude $125,0::0 of non.Fffi~ra1 C'.o~t.5 for ~ry recroM.tionallacihties roc.ommended by the <br />~alion!ll Park ScrviC('. <br />