<br />PROJECT CO~STRUCTION COSTS
<br />
<br />Construction costs of theJ}foject reflect prices as of .January 1969.
<br />A comparison of the re\.;sc cost..") with those presented in the July
<br />1963 (l"'{'Rsibility Report is shown in table 2.
<br />TotHl estirn>>t.ed project costs incrensrd $6,561,000 in the period
<br />1963-70. This significant cost incretl:->c is attribut!lble to the following
<br />cutises: (1) increased cost of right-DC-WRY, (2) increased expenditures
<br />for rrerention liBd fish nllll wildlife fncilitlcs, (3) increased construction
<br />cost.s of water snlvage features, Hnd (4) the addition of sc\'en wells pro-
<br />vided for possible \\"(.11 downtime.
<br />TIU' totul rig-ht-of-wny costs were incfrfised from $1,274,000 to
<br />$3,554,000 on the busis of increased Innd \,.dues in the Sun Luis
<br />\~alley. The present. right,-oC-way cost. estimates nre on a basis of
<br />approximntl'ly $58 per licre, ns compurcd to $15 in the 1963 report.
<br />III th(' prl'Sf'llt enlluation, nil land costs attributable to water salvage
<br />llre inc!uc!t:.d in st.age 1 constructioll, whilt> the 1963 report anticiptlted
<br />acquiring lilIlds Cor ench stage as construction progressed.
<br />The X atiollul Park Service estimated, in its 1963 memorandum,
<br />that constrlletion costs for basic recreation facility development would
<br />be $180,000. The reapprnisnl prelHlred in 1969 by the Bureau of
<br />Outdoor Rpcr(,lltion estImntf.d construction costs would be $532,000,
<br />The major portion of this inCrf'llSe ('nn hf' nttrihuted to increasing the
<br />proposed facilities for minimum de\'clopment to the ultimate condi-
<br />tion dcv('lopment.
<br />In the Ctlrfl'nt reappraisal the size of the ,\Iishak N ationnl 'Vildlife
<br />Refug(' wus significantly incrl'nsf'd. The total cost associated with
<br />the ~Iishnk l\utiomll 'Vildlife Refuge is estimated to be $1,708,000
<br />in t.he 1970 reappraisal, as compared to $414,000 in the 1963 feasibility
<br />report.
<br />Approximately $3,926,000 of the tDtal cost increase eRn be attributed
<br />tD the llbon~.
<br />The balllllcc of tlU' difTert'nce in cost, or $2,635,000, is nccounted for
<br />through project. construction cost repricing: to October 1968 pric.es nnd
<br />cost. illdexin? to .January 1969 prices und the nddition of seven wells
<br />Hlld relt~ted facilitirs at ll. cost of 8350,000.
<br />
<br />TABLE 2.-PROJECT CONSTRUCTION COSTS
<br />
<br />Julyl963
<br />leuibility
<br />report
<br />
<br />Reevaluation,
<br />May 1970
<br />
<br />Waler salvage IUlures:
<br />Slage1__________
<br />Slage2__._____ __._______
<br />Slage3__. ._"_ .__.____00
<br />Slage4......._ ....__n____.._._________ __.._____
<br />Stage 5.___. .... .___.. _ ...n_________...u.__..___________..__u
<br />Mlsl'lak Nalional Wildlife Refuge____._ __... ..u......__u_..____...___
<br />San Luis Lal<' rtcr,ation facilities _______.____..__..._._______.._..__....__..
<br />7 additIOnal wells alld related lacilitIf5._.__.u______u.... _______u..__...___
<br />
<br />$2,213,100
<br />1,328,200
<br />1,848,700
<br />1,359,000
<br />1,027,000
<br />414,000
<br />180,000
<br />o
<br />8,370,000
<br />
<br />1$5,795,000
<br />1,970,000
<br />1,7%,000
<br />1.!iOl,OOO
<br />1,279,000
<br />1,708.000
<br />'532,000
<br />3~,OOO
<br />14,931,000
<br />
<br />TolalCO$L. u__
<br />
<br />Ilncludestll,right.ol.waycoslsforwatflsalvageluturIS 01 1111 5 slagl'S,
<br />I IncludtsUO,OOOtorfistullgfacilillfsatSan LUlSuke.
<br />
|