My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01296
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:51 AM
Creation date
10/9/2006 2:40:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/3000
Title
San Luis Valley Project Closed Basin Division - 1970-1971 - A Report on Closed Basin Division, San Luis Valley Project, Colorado - House Document No. 91-369, 91st Congress, 2d Session
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-0'00n8 <br /> <br />6 <br /> <br />REEVALUATIO~ STATE:\fE:-';T--CLOSED BASI:..' Dn'ISIoX, SAX LUIS <br />VALLEY PROJECT, COLOJU.DO, ~IA y 1970 <br /> <br />PURPOSE <br /> <br />This nnalysi~ shows the effect of costs, policy, Hud procedural <br />changes on tht' Closetl Bll.s~n Division, San Luis.V.u)ley projl'ct. Colo- <br />mdo, from that presented 1Il the .July 1963 Ft>8.S1bdlty Report. <br /> <br />SUM~!ARY <br /> <br />The principnl chllnges affecting the Regionul Dirpctor's .July 1963 <br />Feasibility Report are ns follows: (1) project construction costs were <br />repriced to October 1968 prices null furthC'f indexf'd to .January 1969 <br />prices; (2) the number of wells hus been incn'llsed from 129 to'136 to <br />pro,.ide for downtime find maintenUllt'e operations; (3) the project <br />has been unnlyzl'd in compliance with the Federal \Ynter Project <br />Reclamation Act (Public Law 89-72); (4) an intl'rest rate of 4~' <br />percent is used; (5) :\lishnk National \Vildlife Refuge has been en- <br />larged and now provides for enhancement of wild lift>, IlS well as for <br />mitigation. The revised .refuge plan would take all its \nIter require- <br />ments from the salvage system, nnd surface flows previously planned <br />for the rf'fuge would be salvnged; the July 196:~ Fettsibility Report <br />planned for the refuge wll.ter requirenwllts to be obtained from deep <br />wells unll from surfsci' flows; find (6) costs and bt'lll'fits of recreution <br />have been increased. H('sults of tlwsl' chnllges llre summurized ill <br />table 1. <br /> <br />TABLE I.-SUMMARY OF CHANGES RESULTING FROM REANALYSIS <br /> <br />July 1963 <br />Iltilsibility Reevaluation <br />report May 1970 <br /> <br />Interntrate--percenL____._________._______._. ___.__...__...__.._____________. <br />Number 01 wells. __.. _9______ ____ n.__ _.. __ u ____ __ __ ___. __.. ________.. __ ___ <br />Benefil,coslfatio; <br />Annualequivalentbenelits.__.____..___..u____n..____.....__.....__----... <br />Annual equivalent Federalcosts.._.______.__________..____...______h.__ _..__ <br />Beneflt.cost ratio... .____ _ _ _ ___.h __ u__ _. _ _ _ _ _ _ _ __ __nn______. __. _ .__.____~ <br />Costallocation,ccnstructioncosb; <br />Water nlvaie. _ _ _ _._____ _ __H_ _.____ ____ __ _ _ _ _ _ __. _ ______ ____ ________n_._O <br />Fislt and wildlife enltancemenL_________..___..nn._....____.n.._. <br />Recreation enltancemenL_ _. __ _.n __ __ __n__.. __ _ _______ _ _u______~______ _ ___ <br />Area red'~elopment_____.9.__________._......__________.__________________._ <br />TotaL _ ___ __ _ n_ .nn___ _. _H___ .___________ __nn nn__ __ _ __n_ __ u n___ <br /> <br />'" <br />119 <br />$2,452,800 <br />$448,300 <br />5.47 <br /> <br />$6,906,800 <br />832,400 <br />205,000 <br />425.800 <br />8,370,000 <br /> <br />Reimbursable costs of project, recreation: <br />Construction cost. unO.______ _ n___. U. _ _ _ _ u_ _ n__ __ ____ _ _ _ _ .nn _ __ _ _.___ <br />Interest during construction_ nn _ n_' _____ _ ___ _ ___n__ _ _.. _ _ n n_____..____ __ <br />Subtotal in~estment costs. ___.. u__ n__... n __ __..._.... __u. ______ _n nn. <br />AnnUill O.M, & R. cosL_nn..___u_______ ______u___..__u______u______....__... <br />Fislt andwlldhfe: <br />ConstructioncosL_..____..._ <br />lnlellsl during construction_ <br /> <br />4.875 <br />'" <br />$2.123,000 <br />t9!n,OOO <br />2.14 <br /> <br />$13,492,000 <br />851,000 <br />588,000 <br />o <br />14,931,000 <br /> <br />o <br />o <br />o <br /> <br />251,000 <br />,,"00 <br />257,500 <br />(nooo) <br /> <br />Subtotal in~estment costs_ .___n_nu_.u__unn______n_____________.__u 0 <br />A.nnual O.M. & R. cO$t._.___________n___u_.u______________._n.n_n__.H_._.U_._.___._nn <br /> <br />Total reimbursable costn________ _ _ _ n__n__ _ __ __u _. __u _. _______ _ _ _ nn. <br /> <br />o <br />o <br /> <br />15,000 <br />500 <br />15,500 <br />(l,OOO) <br />273,000 <br /> <br />o <br />
The URL can be used to link to this page
Your browser does not support the video tag.