Laserfiche WebLink
<br />001419 <br /> <br />~13~ <br /> <br />11. Power Production'(Cont'd)s <br /> <br />cannot be determined until the investigaticns and reports on the <br />trans-mountain diversion projects are oompleted, and probably not <br />until the basin-wide reports on the Arkansas and South Platte <br />Rivers are also completed. Because power is an inherent and nec- <br />essary feature of trans-mountain diversion developments, the <br />o policy of the State of Colorado might pro, orly be directed toward <br />reserving the Eastern Slope power markets for such projects, as ' <br />acainst the power projects in the Upper Basin not needed therein. <br /> <br />., <br /> <br />NOTE (17). Further details concerning potential projects in the Upper Basin, <br />and in Hestern Colorado, as described in the Report, are surru"ar-- <br />ized in attached tabulations. <br /> <br />. <br /> <br />, <br />