My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01202
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:02 AM
Creation date
10/9/2006 2:37:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Title
General Management Plan 1-Black Canyon of the Gunnison National Monument and Curecanti National Recreation Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />~ <br />4 <br />PURPOSE AND NEED <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />INTRODUCTION <br /> <br />Curecanti National Recreation Area and <br />Black Canyon of the Gunnison National <br />Monument are directly adjacent to one <br />another and are linked ecologically as part of <br />the larger Gunnison River Basin ecosystem. <br />Yet each park has a very different purpose. <br />Together, these park units contribute <br />different resources and spectrums of <br />recreational opportunities for the tourism <br />that exists in the larger Grand Junction- <br />Montrose-Delta-Gunnison-North Fork area. <br /> <br />The region in which the parks lie is one of <br />great elevation ranges (see Vicinity Map). <br />Both parks are common to the Gunnison <br />River with elevations from 6,500 feet above <br />sea level in Black Canyon, rising above <br />14,000 feet on mountain peaks visible within <br />30 miles. The parks are approximately 250 <br />miles southwest of Denver. <br /> <br />Black Canyon of the Gunnison has a unique <br />and spectacular landscape that was fonned <br />slowly by the action of water and rock <br />scouring down through hard Proterozoic <br />crystalline rock. No other canyon in North <br />America combines the narrow opening, sheer <br />walls, and startling depths offered by the. <br />Black Canyon of the Gunnison. The park <br />shares its eastern boundary with Curecanti <br />National Recreation Area. <br /> <br />The Curecanti National Recreation Area is <br />composed of three reservoirs named for <br />corresponding dams on the Gunnison River. <br />Panoramic mesas, fjord-like reservoirs, and <br />deep, steep, and narrow canyons abound. <br />Blue Mesa Reservoir is Colorado's largest <br />body of water and is the largest Kokanee <br />Salmon fishery in the United States. Morrow <br />Point Reservoir is the beginning of the <br /> <br />I <br /> <br /> <br />Black Canyon of the Gunnison, and below, <br />Crystal ReserVOIr is the site of the Gunnison <br />Diversion Tunnel, a National Historic Civil <br />Engineering Landmark. Recently discovered <br />dinosaur fossils, a 5,000-acre archeological <br />district, a narrow-gauge train, and traces of <br />6,000-year-old dwellings further enhance the <br />offerings of Curecanti. <br /> <br />The purpose of this environmental <br />assessment is to provide sufficient <br />infonnation and analysis for detennining <br />whether to prepare a Finding of No <br />Significant Impact (FONS!) or filing a <br />Notice of Intent (NOI) to prepare an <br />Environmental Impact Statement (EIS). If, <br />based on review of the General Management <br />Plan and the results of the public review <br />process, the field director concludes that the <br />plan will result in significant environmental <br />impacts, then the project would include <br />preparation of a draft and final EIS. <br /> <br />This plan sets forth the basic management <br />philosophy for both parks, managed as one <br />integral unit, and provides strategies for <br />addressing issues and management <br />objectives. This document includes <br />measures for the preservation of the area's <br />resources, indications of the types and <br />general intensities of development (including <br />visitor circulation and transportation <br />patterns, systems, and modes) associated <br />with public enjoyment and use of each area, <br />and the first steps in identifying visitor <br />carrying capacities for both units. <br /> <br />The document also discloses the potential <br />environmental consequences, so far as can be <br />detennined by a strategic plan, that may <br />result from implementation of various <br />alternatives. It documents the process used <br />by the National Park Service in preparing a <br />general management plan for both parks. <br /> <br />ooil1~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.