Laserfiche WebLink
<br />Q{)~13S <br /> <br /> <br />.f( <br /> <br /> Target Dates <br /> Upper Colorado River Basin Water Resources Planning Model Enhancements <br /> Draft Memo Comments/Input <br />Subtask Descriotion to State from State Final Memo Notes <br />5.01 Phase IIlnstream Flows n/a n/a , n/a <br /> , <br />5.02 Map Irrigated Lands n/a 4/21/97 n/a <br />5.03 Agqregate Irrigation Structures 5/12/97 .. 5/19/97 5/26/97 1) <br />5,04 Add Aggregated Structures to Network 5/19/97 5/26/97 6/2/97 1) <br />5.05 Define Water Right Classes <f'5/5/9"!::d 5/12/97 5/19/97 1) <br /> . <br />5.06 Develop Return Flow Data 5/19/97 5/26/97 6/2/97 <br />5,07 Generate Aqgregated Parameters 5/26/97 6/2/97 6/9/97 <br />5,08 Assian Irrigation Efficiencies l"4l21 /97') 4/28/97 5/5/97 <br />5.09 Generate new ,ddm and ,ddh files 6/2/97 6/9/97 6/16/97 1) <br />5.10 AQgregate M & I Use n/a 5/12/97 n/a <br />5.11 AQgregate Reservoirs and Stock Ponds n/a 5/12/97 n/a <br />5.12 Review Instream Flows I'i ~/97~ 5/12/97 5/19/97 .- <br />5.13 Calibration Review n/a n/a 6/16/97 2) <br />5.14 Calibration 7/7/97 7/14/97 7/21/97 <br />5.15 Prepare Baseline Data Set 7/7/97 7/14/97 7/21/97 <br />5.16 Documentation 8/18/97 9/1/97 9/15/97 <br /> 1) Initial Schedule extended, dependent on Subtask 5,02 l 11;,1,7 I <br /> 2\ Start Calibration 6/9/97 <br /> <br />~~-, <br /> <br />j( <br /> <br />c- ~ b f'!".r ~ -r- 7;,,..; <br />