Laserfiche WebLink
<br /> Target Dates <br /> Upper Colorado River Basin Water Resources Planning Model Enhancements <br /> Draft Memo Delivery Comments/lnput Return Delivery <br />Subtask Description to State Date from State Date Final Memo Date Notes <br />5.01 Phase IIlnstream Flows n/a n/a n/a <br />5.02 Map Irrigated Lands n/a ( 4/21/97 ') n/a <br />5.03 Aggregate Irrigation Structures 5/12/97 5/19/97 5/26/97 1) <br />5.04 Add Aggregated Structures to Network 5/19/97 5/26/97 6/2/97 1) <br />5.05 Define Water Right Classes 5/5/97 5/12/97 5/19/97 1) <br />5.06 Develop Return Flow Data 5/19/97 5/26/97 6/2/97 <br />5.07 Generate Aggregated Parameters 5/26/97 6/2/97 6/9/97 <br />5.08 Assign Irrigation Efficiencies 4/21/97 4/18/9 7 4/28/97 5/5/97 <br />5.09 Generate new ,ddm and ,ddh files 6/2/97 6/9/97 6/16/97 1) <br /> - -. <br />5.10 Aggregate M & I Use n/a 5/12/97 n/a <br /> - ----- <br />5.11 Aggregate Reservoirs and Stock Ponds n/a 5/12/97 n/a <br />5,12 Review Instream Flows 4/28/97 4/25/97 5/12/97 5/19/97 <br />5.13 Calibration Review n/a n/a 6/16/97 2) <br />5,14 Calibration 7/7/97 7/14/97 7/21/97 <br />5.15 Prepare Baseline Data Set 7/7/97 7/14/97 7/21/97 <br />5.16 Documentation 8/18/97 9/1/97 9/15/97 <br /> 1) Initial Schedule extended, dependent on Subtask 5.02 <br /> 2) Start Calibration 6/9/97 <br /> <br />j <br /> <br />J <br /> <br />5'!!!-9-1 <br /> <br />.0 <br />= <br />c..., <br />,..... <br />Coo.) <br />U1 <br /> <br />- <br /> <br />