My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01049
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:09:04 AM
Creation date
10/9/2006 2:32:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies - General Water Studies
State
CO
Basin
Statewide
Date
4/1/1971
Author
Unknown
Title
Western United States Water Plan Study - Western US Water Plan - Proposed Plan of Study - Official Review Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />April 1, 1971 <br /> <br />OO~373 <br /> <br />number of components or purposes served. Consideration must <br />also be given to resource capabilities, technical possi- <br />bilities, and the extent to which additional alternative <br />plans would contribute to the selection of a recommended <br />plan. <br />5. Analyze and compare basic plans to show tradeoffs between <br />alternative plans which serve differing components or mixes <br />of components in terms of effects on water requirements and <br />on the multiobjectives. The array of alternatives will be <br />reduced to a manageable number by recognizing areas of <br />convergence, those that are complementary, and reconciling <br />differences where desirable; some reformulation and mod- <br />ification may be required in this step. This effort will <br />reflect the continuing participation of Pederal, State, <br />local, and private interests. In this step of the study, <br />the alternative Westwide plans will be produced and pre- <br />sented in 1975 for official public review and comment. <br />6. Each of the alternative plans will be tested with regard to <br />its acceptability by the public and its compatibility with <br />known institutional constraints; its effectiveness in <br />serving components or purposes of the multiobjectives; its <br />efficiency measured in terms of being the least costly plan <br />which would achieve generally the same performance level; <br />and its completeness, in that account is made for: (1) all <br /> <br />) <br /> <br />VI-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.