My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00923
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00923
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:08:13 AM
Creation date
10/9/2006 2:25:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Computer Models - Colorado River Decision Support System (RAY)
State
CO
Basin
Western Slope
Date
9/6/1996
Title
Dept of Natural Resources: 1996 Condencsed IMAP Analysis
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Other Concerns - Statewide Issues: <br /> <br />The IMC staff included the following comments and questions in every depart- <br />ment or agency IMAP analysis beginning last year. Please provide updates on <br />these items for your department. <br /> <br />YEAR 2000: <br />It is imperative that all of the State's business applications, packaged applications, <br />and system software be able to handle the Year 2000 date change. The problem <br />is that most applications currently handle dates as two-digits without the ability to <br />, distinguish between 19xx and 20xx centuries. The effort required to resolve this <br />problem could be extremely time consuming and expensive. Departments need to <br />assess the impact of the Year 2000 on its existing applications now and develop <br />practical action plans to solve this problem. <br /> <br />What steps is the department taking to respond to the Year 2000 risk? <br />Did the Department respond to the OSP&B Year 2000 survey? <br /> <br />DISASTER RECOVERY/BUSlNESS RESUMPTION: <br />An IMC policy issued July 30, 1990 requires agencies with information systems <br />operations to have a tested, comprehensive disaster recovery plan in place by June <br />30, 1993. This issue becomes even more important with the increased number of <br />mid-range and LAN systems throughout state government. With the prolifera- <br />tion of end-user computing and distributed architectures, all State agencies need <br />to assess their current risk and develop a business resumption strategy. Topics <br />fouesearch and analysis to develop a business resumption plan include: equip- <br />ment recovery and replacement, temporary office space, recovery of software <br />and data, personnel deployment, and telecommunications lines. <br /> <br />Does the department have a tested disaster recovery plan in place? <br />What steps has the department taken to ensure business resumption in <br />the case of a disaster? <br /> <br />ARCHIVINGIPURGING: <br /> <br />Increased volumes of data cause deterioration of service to a department's users, <br />increased time to complete backups, and the need for more disk storage and faster <br />processors. Failure to archive and purge data results in unneeded expense to the <br />State of Colorado. <br /> <br />Department of Natural Resources 9/6/96 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.