My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00904
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:08:06 AM
Creation date
10/9/2006 2:24:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8402.400.10
Description
Platte River Basin-River Basin Basic Hydrology-Transmountain Diversions Imports-Blue South Platte
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Title
Blue South Platte Project 1942-1955-Appropriations for Colorado Big Thompson Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,I <br /> <br />i <br />APPRUPRIATIONS FOR COLORADO-BIG THOMfvJN PROJECT <br /> <br />O. An allocation of $150,000 was made available early in 1935 from the appropriation <br />of 13.300.000,000 fcr National Industria~ Recovery contained in the appropriation act <br />of June 16, 1933, 48 Stat" 275, for "an investigation and rAport on the <br />proposed Grand Lake-Big Thompson Transmountain Project which, will divett <br />water from the basin of the Colorado River to the basin of the South Platte <br />RiveF in Colorado." <br /> <br />1. 1st Appropriation _ Act of August 9, 1937 (50 Stat., 564), <br /> <br />"The following SUlllS' are appropriated out of the spec'ial fund in the <br />Treasury of the United States created by the Act of June 17, 1902 <br />(U. S. C., title 43, secs,. 391. 41111). and therein designated Ithe <br />reclamation fundI to be available immediately:" <br /> <br />"Colorado_Big Thompson Project, Colorado: Fozr construction in accordance <br />with the plan described in Senate Document Numbered 80, Seventy_fifth <br />Congress, $900,000: Provided. That no constnuction thereof shall be COmb <br />menced untill the repayment of all costs; of the project shall, in the opinion <br />"",','10r::' the Secretary of the Interior, be assured by appropriated contracts with, <br />Vf8.ter conservancy distriots,. or irrigation districts 0"" water users I associa- <br />tions organi zed under the law!> of Colorado. or other form of organi zation <br />satisfactory to the Secretary of the Interior;" <br /> <br />"Total, from reolamation fund, $11,016.600."' <br /> <br />2. 2nd Appropriation - Act May 9. 1938 (52 Stat., 291 - 318) <br /> <br />"The following sums are appropriated out of the special fund in the <br />Treasury of the United States created by the Act of June 17. 1902 <br />(43 U. s. C. 391, 411). and therein designated "The reclamation fund" to <br />be available immediately: <br /> <br />"Construction: FOIr continuation of construGtion of the following projects <br />in not to exceed the following amounts. respectively, to be expended from <br />the Reclamation Fund under the same general conditions and in the same <br />manner and for the same objects of expenditure as specified for projects <br />hereinbefore in this Act under the caption "Bureau of Reclamation", and <br />to be reimbursable under' the reclamation law: <br /> <br />"Colorado-Big Thompson project. Colorado, $1,250,000: Provided. That not <br />less than $600,000 of the sum hereby appropriated shall be expended in <br />the construction of the Green Mountain Reservoitr in accordance with the <br />plans set forth in Senate Document Numbered C80 of the Seventy_fifth <br />Congress, and that construction of said reservoitr shall be commenced at or <br />before the time of beginning the construction of the tunnel described in <br />said Document Numbered 80;" <br /> <br />"Total, from reclamation fund, $10,574,600~" <br /> <br />2561. <br />
The URL can be used to link to this page
Your browser does not support the video tag.