My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00750
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:50:56 AM
Creation date
10/9/2006 2:20:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
2/2/1981
Author
William Paddock
Title
Azure Sheephorn Reservoir Project-Corres Reports etc-1980-1987-City of Golden and Vidler Water Tunnel Company-Petition for the Imposition of Certain Conditions on Any Preliminary Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l~' <br /> <br />'. <br /> <br />. <br /> <br />P,k <br /> <br />} <br /> <br />,\, <br /> <br />UNITED STATES OF AMERICA <br />FEDERAL ENERGY REGULATORY COMMISSION <br /> <br />CITY OF GOLDEN. COLORADO and <br />VIDLER WATER TUNNEL COMPANY <br /> <br />PROJECT NO. 2763 <br /> <br />PETITION OF THE DEPARTMENT OF NATURAL <br />RESOURCES. STATE OF COLORADO FOR THE IMPOSITION <br />OF CERTAIN CONDITIONS ON ANY PRELIMINARY WORK <br />PERMIT ISSUED TO APPLICANTS <br /> <br />This petition is in response to the "F.E.R.C. Prelimi- <br />nary Permit Application Detailed Work Plan" submitted by <br />the City of Golden. Colorado and Vidler Tunnel Water Company. <br />appl icants in project No. 2763. The purpose of this petition <br />is two-fold. First. it is to re-assert the position of the <br />Department of Natural Resources that the F.E.R.C. should pre- <br />pare an assessment of the environmental impacts of the pro- <br />posed preliminary permit period stuoies. The second purpose <br />of this petition is to request certain minimum conditions <br />be ~laced upon any preliminary permit issued in this matter. <br /> <br />Bf~Ul~~~YlRQtl~ftll!1-A~~f~~~ <br /> <br />The "F.E.R.C. Preliminary Permit Detailed ~ork Plan" <br />show that appl icants will carry out extensive geological. <br />geophysical. biological. hydrological and other investiga- <br />tions during the prel iminary permit study period. These <br />studies. when compared with the data s~bmitted by the Depart- <br />ment of Natural Resources. show there is considerable poten- <br />tial far adverse environmental impacts during the study <br />period. 8ased on these submiSSions it can not be categori- <br />cally determined that iSsuance of a prel iminary permit will <br />not have significant impacts on the human environment. <br />Thus. far the reasons stated in part II C of the "Petition <br />of the National Wildlife Federation. et al. ..." the F.E.R.C. <br />must prepare an environmental assessment of the proposed pre-, <br />liminary per~it studies. This environmental assessment <br />must be prepared prior to the issuance of any prel iminary <br />per.nit. <br /> <br />0970 <br /> <br />17<J1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.