Laserfiche WebLink
<br /> <br />..,' <br /> <br /> <br />." .. <br /> <br /> <br />( <br /> <br />spoilbonk <br /> <br />r- - spoilbonk <br />I <br /> <br />Riverside conol) <br /> <br />( <br /> <br /> <br />-2:1 Spoil bonk heigh! <br />I <br />I <br />I <br />I <br />II! <br /> <br />2:1- <br /> <br />-2:1 <br /> <br />c!!ivelslde conol <br />\ <br /> <br />width <br /> <br />I <br />I <br />I <br />I <br />>1 <br /> <br />'-Low flow chonnel <br /> <br /> Ch;tnnel Lanacltv i\idth Hei~ht of Sooll Bank <br /> River Reach (cubic feet per se~ond) (fPE't) ( fpet) <br /> Rio Grande Main Stem, <br /> Hanna Bridge to Rio Grande Canal Diversion 6,200 200 8.2 <br />~ Rio Grande Canal Div. to Farmers Union Canal Div4 4, ~OO 150 7.9 <br /> Farmers Union Canal Div. to Emoire Canal Div. 3,700 110 8.0 <br /> Empire Csnsl Diversion to Costilla Canal Div. 2.7~0 110 8.1 <br /> Cost ills Canal Div. to Alsmosa Gaging Station 1,500 110 7.5 <br /> Alamoss Gaging Sta. to D&RGW RR Ilridge 1,';00 <br /> D&RGW RR Bridge to New Ditch Diversion I, ';00 120 8.0 <br /> New Ditch Diversion to Conelos River 1,500 120 R.O <br /> Conejos River to 6 miles below Conejos River 3,000 240 8.1 <br /> Conejos Riven <br /> Mo~ote Gsging Station to U.S. 285 2,000 163 4.8 <br /> U,S. 285 to Rio Grande 1,500 174 5.1 <br /> <br />SAN LUIS VALLEY PROJECT <br />RIVER RESTORATION <br />TYPICAL SECTION <br />RECONNAISSANCE SKETCH <br /> <br />PLATE 1 <br />