Laserfiche WebLink
<br />001247- <br /> <br />. <br /> <br />. <br /> <br />Mr. Harold L. Ziegler <br /> <br />2 <br /> <br />If the respective Boards have no objection, We plan to ask for these two items <br />at your July quarterly meeting. <br /> <br />The lands needed for Stage 4 are mostly State land but some private land will be <br />acquired. The land acquisition will start this SUMmer with sufficient lead time <br />to complete by the end of September. <br /> <br />Attached is a bar chart outlining our proposed schedule. We would appreciate <br />your comments as early as possible and would be available for discussion at your <br />April meeting. <br /> <br />~ <br /> <br />S~J:ij 1J{;~~~:a <br /> <br />~~-"':-~:.._-~~_........._.. . <br /> <br />Lindell H. Elfrink <br />Project Construction Engineer <br /> <br />Enclosures <br /> <br />cc:~. J. William McDonald <br />Colorado Water Conservation Board Director <br />1313 Sherman Street <br />Room 823 <br />Denver, Colorado 80203 (w/enclosures) <br />