Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />which were not operated, either partially or entirely, in the <br /> <br />studies made to estimate the Rangely Project water supplies. For <br /> <br />convenience, 7hese rights are lis7ed under classifications <br /> <br />according to their general nature. An estimate of the potential <br /> <br />" <br /> <br />effect of each right on the estimated water supplies of the Rangely <br /> <br />" <br /> <br />Project is contained in the DISCUSSION section of ~his report. <br /> <br />WATEIl RIGIfTS <br /> <br />A. Senior Conditional Large Rights in the CORSIM II Data <br />Base Which Were Not Operated: <br /> <br />I. Moon Lake-Staley Mine Pipel ine (Original) -- 125.2 cfs <br /> <br />2. Boies Project; consisting of: <br /> Piceance Canal 50 cfs ) Limited to a total <br /> ) comb i ned entitle- <br /> Piceance Pipel ine 50 cfs ) ment of 50 cfs <br /> Boies Reservoir 31,021 AF <br /> . . <br />3. FI attops Project; White River basin features consisting o~' <br />. . <br /> <br />Piceance Basin Pipeline <br /> <br />60 cis <br /> <br />Patterson Creek Collection Canal <br /> <br />75 cfs <br /> <br />" <br /> <br />FlatTops Tunnel <br /> <br />254 cfs <br /> <br />Rio Blanco Reservoir <br /> <br />128,591 AF (live storage) <br /> <br />4. Highland:Ditch, 5th Enlargement -- 180 cfs <br /> <br />02~2.::-\ <br /> <br />- 2 - <br />