My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00496
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:50:07 AM
Creation date
10/9/2006 2:13:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1999
Author
McLaughlin Engineers
Title
Phase 1 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - Draft - 04-01-99
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />003J78 <br /> <br />. <br /> <br />5. Expanded coordinated reservoir operations (This would include looking at alternatives <br />for coordinated reservoir operations that were not investigated in the Coordinated Reservoir <br />Operations investigation,) <br /> <br />6. Removal of Shoshone senior and/or junior cal1s <br /> <br />7. Variations on Ruedi Reservoir pump back project <br /> <br />8. Reserve a portion of the yield from the reconfigured Eagle-Piney project for the 20,000 <br />acre-feet target <br /> <br />9. Expand or otherwise modify the RIPRAP alternatives that are included in the Preliminary <br />Draft Programmatic Biological Opinion for Recovery Program Actions and Water <br />Depletions in the Upper Colorado River from Rifle, Colorado to Lake Powell (U.S. Fish and <br />Wildlife Service, 1999) to produce additional yield which would count toward the 20,000 <br />acre-feet target without reducing the yields from these alternatives as detailed in the <br />Programmatic Biological Opinion. <br /> <br />10, Reconsider, expand or otherwise modify eXlstmg alternatives (other than those <br />considered in the Preliminary Programmatic Biological Opinion) for supplying the 20,000 <br />acre-feet <br /> <br />11. Eliminate the Orchard Mesa Irrigation District power plant <br /> <br />12. Replace Orchard Mesa Irrigation District hydraulic pumps with electric pumps, <br /> <br />13. Re-analysis of Grand Valley Water Management alternatives. <br /> <br />GUNNISON RIVER TRANSBASIN DIVERSION <br /> <br />(REI TO WRITE) <br /> <br />GREEN MOUNTAIN RESERVOIR <br />CONJUNCTIVE OPERATION <br /> <br />(Leo writes) <br /> <br />RUEDI RESERVOIR <br />CONJUNCTIVE OPERATION <br /> <br />(REI writes <br /> <br />NEW OFF-MAINSTEM STORAGE <br /> <br />P:II 999199-0081001 OOlwplReport Text.wpd <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.