Laserfiche WebLink
<br />. <br /> <br />003J78 <br /> <br />. <br /> <br />5. Expanded coordinated reservoir operations (This would include looking at alternatives <br />for coordinated reservoir operations that were not investigated in the Coordinated Reservoir <br />Operations investigation,) <br /> <br />6. Removal of Shoshone senior and/or junior cal1s <br /> <br />7. Variations on Ruedi Reservoir pump back project <br /> <br />8. Reserve a portion of the yield from the reconfigured Eagle-Piney project for the 20,000 <br />acre-feet target <br /> <br />9. Expand or otherwise modify the RIPRAP alternatives that are included in the Preliminary <br />Draft Programmatic Biological Opinion for Recovery Program Actions and Water <br />Depletions in the Upper Colorado River from Rifle, Colorado to Lake Powell (U.S. Fish and <br />Wildlife Service, 1999) to produce additional yield which would count toward the 20,000 <br />acre-feet target without reducing the yields from these alternatives as detailed in the <br />Programmatic Biological Opinion. <br /> <br />10, Reconsider, expand or otherwise modify eXlstmg alternatives (other than those <br />considered in the Preliminary Programmatic Biological Opinion) for supplying the 20,000 <br />acre-feet <br /> <br />11. Eliminate the Orchard Mesa Irrigation District power plant <br /> <br />12. Replace Orchard Mesa Irrigation District hydraulic pumps with electric pumps, <br /> <br />13. Re-analysis of Grand Valley Water Management alternatives. <br /> <br />GUNNISON RIVER TRANSBASIN DIVERSION <br /> <br />(REI TO WRITE) <br /> <br />GREEN MOUNTAIN RESERVOIR <br />CONJUNCTIVE OPERATION <br /> <br />(Leo writes) <br /> <br />RUEDI RESERVOIR <br />CONJUNCTIVE OPERATION <br /> <br />(REI writes <br /> <br />NEW OFF-MAINSTEM STORAGE <br /> <br />P:II 999199-0081001 OOlwplReport Text.wpd <br /> <br />11 <br />