Laserfiche WebLink
<br />oc >. ~ i <br /> <br />- 2 - <br /> <br />6. Source of Supply <br /> <br />The source of supply Is the headwaters of Los Pinos C~eek. <br />Los Pinos 1s tributary to the Canejas River, thence to the Rio <br />Grande. <br /> <br />7. Estimated Cost of Project <br /> <br />The engineer's estimate Is $30,078.80. Adding the usual engineer- <br />ing fee of ~ to the estimate brings the total price of the project to <br />$31,884.00. However, in view of the difficulties unfcTseen ahd fre- <br />quently encountered in projects of this type, it Is requested,that the <br />Commission at this time authorize the project at a cost of $40,000.00. <br /> <br />a. Height of D3.m <br /> 36 feet. <br />9. Maximum Depth of Lake <br /> 31 feet. <br />10. Maximum Area of lake in Square Feet <br /> 3,036,999 <br />11. Mlx imurr. Area of Lake In Acres <br /> <br />69.72. <br /> <br />12. Capacity of Lake in Acre Feet <br /> <br />949.03. <br /> <br />13. Major Construction Features <br /> <br />(a) Dam of earth fill. <br />(1:) Face or dam to be riprapped vith native stone. <br />(e) A bottom o~tlet t~ be installed. <br />(d) Dam to be equipped vith an adequate spill'JaY. <br /> <br />14. Approvals Needed <br /> <br />(a) Colorado Garee and Fish Commission. <br />(b) U. S. Fish and Wildlife Service. <br />(c) State Engineer's Office. <br />(d) U. S. Forest Service. <br /> <br />15. Local Sportsmen.'s Approval <br /> <br />This project has nct been officially brought to the attention <br />of spo~ts~en in the viCinity of the reservoir site. However, it is <br />not anticipated that there will be any objection by sportsffien to a <br />project of this type. <br />