Laserfiche WebLink
<br />------------------- <br /> <br /> dam construction. <br /> Site development of the wildlife habitat lands to <br /> include: long-term management of area; soil/water See response to status of 3-3 above. An interim <br /> inventory, development plan preparation; boundary management plan was developed in 2003 which <br /> survey& fencing; rehab of fences and unneeded will be used until a long term management plan <br /> roads, controlled access, parking, signage; weed can be developed. Boundaries have been <br /> control, erosion control, vegetation and habitat surveyed and signs posted. Fencing, weed <br /> enhancement. control and vegetation enhancement scheduled to <br /> start in 2004. <br />5-2 Construction specifications will be developed to 2000 FSEIS 5-13 Noise, traffic, and human restrictions to minimize <br /> include noise, traffic, and human restrictions to disturbance to wildlife were included in the <br /> minimize disturbance to wildlife near construction specifications of all awarded construction <br /> zone of RBD. Carbon Mountain gas pipeline contacts. The pipeline routes referred to in this <br /> route, that could affect Golden Eagles, will not be commitment were not used resulting in <br /> considered. Efforts will be made to avoid avoidance of prime elk caving areas and golden <br /> construction in the vicinity of elk calving areas eagle nests <br /> during the May-July period. <br />5-3 Reclamation will ensure that recreation facilities 2000 FSEIS 5-13 No decision has been made on the type and <br /> and realignment of County Road 211 (CR 211) are magnitude of recreation facilities that will be <br /> sited or restricted in such a way to minimize constructed in the Ridges Basin area. The design <br /> impacts to elk & deer habitat utilization and design of CR 211 is being worked on and avoids <br /> of road crossings will minimize impact to wetlandslriparian areas. <br /> wetland/riparian resources. Indirect impacts will <br /> be managed through a plan that will support the <br /> minimization or elimination of those <br /> conflicts/impacts. Recreation facilities will not be <br /> permitted on the west and south sides of reservoir <br /> to reduce big game corridor impacts and trails will <br /> be restricted to foot traffic only. Wildlife related <br /> activities will be encouraged. Future use of <br /> <br />8 <br /> <br />g <br />c::.;) <br />00', <br />00 <br />-.1 <br />