My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br />4-6 Monitor AR riparian corridor to determine effects 2000 FSEIS 5-12 Action on this alternative will not begin until <br /> of pumping regime on downstream resources; also approximately two years before pumping begins <br /> include Basin Creek wetlands. at the DPP <br />4-7 Limit ground disturbance due to construction of 2000 FSEIS 5-12 No construction took place on the NNMP during <br /> the Navajo Nation Municipal Pipeline (NNMP) 2003 <br /> and other pipelines and replace riparian trees lost <br /> due to construction at 2: 1 ratio. <br />4-8 For the construction of the non-binding end uses, 2000 FSEIS 5-12 No activity on construction of non-binding end <br /> only the minimum construction areas will be used uses during 2003 year and no activity on this <br /> to minimize the construction impacts to wetlands commitment. <br /> and riparian areas. If avoidance is not possible, a <br /> wetland/riparian mitigation and monitoring plan <br /> will be developed to compensate for the loss of <br /> vegetation. <br />S - Wildlife Commitments <br />5-1 Mitigate direct and indirect loss of approximately 2000 FSEIS 5-12 See response to status of 3-4 above. <br /> 2,700-2,900 acres of wildlife habitat through & <br /> purchase, enhancement and management of 2,700- 5-13 <br /> 2,900 acres of suitable habitat; amount of land <br /> acquired will depend on wildlife potential of those <br /> acquired lands. Priority will be given to lands in <br /> LPR drainage and RB vicinity. Large contiguous <br /> unfragmented parcels will be given priority. The <br /> land will be managed for wildlife purposes with <br /> coordination with the Fish and Wildlife Service <br /> (Service), Colorado Division of Wildlife (CDOW) <br /> and SUIT. Other uses will not be allowed if they <br /> interfere with wildlife habitat benefits. The <br /> wildlife mitigation lands will be acquired prior to <br /> award of contract for construction of RBD, and <br /> mitigation development will be concurrent with <br /> <br />7 <br /> <br />0' <br />c;;l" <br />C;;) .... <br />00 <br />00 <br />en . <br />
The URL can be used to link to this page
Your browser does not support the video tag.