My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e3. <br /> <br />STATE: Use the data provided by the utility smlink, to redimension StateMod to'accommodate <br />the new structures added in Phase lIla, <br />4, Boyle: ModifY StateMod input files to include unique considerations such as transbasin diversions <br />and the overlap associated with the GUlU1ison and Colorado River Basin Models. Include any <br />enhancements mutually agreed on in Task I of this Task. <br />5. Boyle: ModifY control parameters, including both the control file and headers to reflect the linked <br />model application. <br /> <br />Deliverables: <br />I. Boyle: Meeting minutes documenting enhancements to be performed the linked model. <br />2. Boyle: Combined StateMod input files for linked model. <br />3. STATE: Redimensioned StateMod program. <br />4. Boyle: Modified files to include unique considerations and enhancements, <br />5. Boyle: Modified control parameters and headers to reflect the linked model application, <br /> <br />Task 9.03 <br /> <br />Execute Linked model <br /> <br />Objective: Demonstrate that the linked model can be executed successfully, Enhance <br /> <br />. <br /> <br />Assumptions: It is the responsibility of the State to insure StateMod is dimensioned adequately to <br />execute the linked model. <br /> <br />Approach: <br /> <br />I. Boyle: Test and correct the linked model input files operation, Compare basin outflow from the <br />linked model to the individual basin models. Report any concerns to the State, <br />2. Boyle: Revise the Phase II linked model memorandum to include Phase IIIa enhancements. This <br />memo will be prepared in draft form and submitted to the State for conunents, to be given to Boyle <br />within one week of receipt. Boyle will finalize the memo within one week of receiving State <br />comments, <br />3. STATE: Create On-Line representation of the linked model memorandum with appropriate HTML <br />links. <br /> <br />Deliverables: <br />I. Boyle: Operating linked model. <br />2. Boyle: Two hard copies and one in word processing form (Word for Windows) of the revised <br />linked model Task Memorandum which includes Phase IIIa enhancements. <br />3. STATE: On-Line representation of the linked model memorandum, <br /> <br />. <br /> <br />1135 <br /> <br />Phase IlIa Scope of Services <br /> <br />A.50 <br /> <br />Jan31,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.