Laserfiche WebLink
<br />. <br /> <br />TASK IIIa-9 <br /> <br />Linked West Slope Water Resources Planning Model <br /> <br />Objective: To combine the phase IlIa files of the White River Basin, Yampa River Basin, Gunnison <br />River Basin, Upper Colorado River Basin, and San Juan/Dolores River Basin Water Resource Planning <br />Models into a single model that links the functions and operational choices that exist in all these river <br />systems. Revise the Phase II linked model memorandum to include Phase IlIa enhancements. <br /> <br />Assumptions: Structure and node identifications that are data "keys" for StateMod are unique across <br />the White, Yan1pa, Colorado, Gunnison, and San JuanJDolores models, In other words, nodes, <br />structures, and rights do not have to be renamed or renumbered in the linked model. <br /> <br />Prerequisites: Completion of Tasks IlIa-2, 3, 4, 5, 6, and 7. <br /> <br />Task Leader: <br />Task 9.01 <br /> <br />Meg Frantz (Boyle) <br />Review Phase 11 Model Linkage <br /> <br />Objective: Review procedure used in Phase II to link and demonstrate functionality of the linked basin <br />model. <br /> <br />. <br /> <br />Approach: <br />I. Boyle: Review approach used in Phase II to link and demonstrate functionality of the linked model. <br />IdentifY potential enhancements such as the addition of a new transbasin diversion (Dome Creek) or <br />additional programming to minimize hand edits. <br /> <br />Deliverables: <br />I. Memorandum describing enhancements, if any, to the Phase II approach used to build and <br />demonstrate linked model functionality. Recommendations, if any, to enhance the linked model. <br /> <br />Task 9.02 <br /> <br />Create Linked Input Files <br /> <br />Objective: Assemble the linked model input files from the Phase IlIa single-basin model baseline <br />scenario input files, <br /> <br />Assumptions: Node, structure, and right identifiers are unique across five basins, meaning that they <br />will not need to be renumbered. <br /> <br />. <br /> <br />Approach: <br />I. Boyle: In coordination with the State develop a scope of activities to include enhancements <br />identified in Task 9,01 that are consistent with the Budget and Schedule. This activity is expected <br />to occur following a regularly scheduled progress meeting, <br />2. Boyle: Use the StateMod utility, smlink, developed in Phase II to concatenate StateMod input <br />files. This utility allows all input files to be combined, but does not currently address unique <br />considerations such as trans basin interactions and model overlaps. In addition, it provides a listing <br />of StateMod dimension requirements. <br /> <br />Phase IlIa Scope of Services <br /> <br />A-49 <br /> <br />1136 <br /> <br />Jan 31, 1997 <br />