My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~Yle: State review of calibration process. <br />4. Boyle: Final graphs of structures presented in the Phase II report. <br />5. Boyle: Task 3.14 memorandum documenting the calibration process and results, The <br />memorandum will include a comparison of Phase IlIa calibration to Phase II and Phase IlIa <br />calibration to gaged records. <br />6, As appropriate, revised Task Memorandum to reflect enhancements associated with the calibration. <br /> <br />Task3.1S <br /> <br />Prepare Baseline Data Set <br /> <br />Objective: Develop a StateMod input data set that represents current conditions. This data set will <br />be available to future users who want to investigate the impact of new water rights or operations on the <br />basin by executing paired StateMod runs representing conditions before and after the contemplated <br />change, <br /> <br />Assumption: A baseline data set for the Phase II model will already be available. This task involves <br />updating the baseline demand (*B.ddm) and baseline reservoir target file (*B.tar) to reflect the Phase <br />IlIa enhancements. It is expected that no new operational or administrative changes will need to be <br />addressed in the Yampa basin, <br /> <br />. <br /> <br />Approach: '/ <br />I. Boyle: Revise the command files and rerun the DMI/dcmandd to include Phase IIIa enhancements <br />, <br />in the baseline demand file (*B.ddm). <br />2, Boyle: Revise the reservoir baseline target file (*B.tar), response file (*.rsp), control file (*ctl) and <br />operation right file (* .opr) to include Phase IIIa enhancements. <br />3, Boyle: Task Memorandum 3.15 containing approxi!l1ately 2 pages of text describing the results 0 <br />this Task, <br /> <br /> <br />Deliverables: <br />I. Boyle: Baseline demand file. <br />2, Boyle: Baseline target, response, control and operation files. <br />3. Boyle: Task Memorandum 3.15 describing the results of this Task. <br /> <br />Task 3.16 <br /> <br />Documentation <br /> <br />Objective: Prepare a final engineering report in hard copy, which, when approved, will be loaded onto <br />the CRDSS system for On-Line access. <br /> <br />Assumption: The final engineering report will include an Appendix which contains the Task <br />Memoranda submitted under earlier tasks. On-Line presentation of engineering notes is not required. <br />The Phase II data preparation chapter (section 4) will be revised to reflect the Phase IlIa enhancements, <br />The calibration section of the final report will be revised to reflect the Phase IlIa calibration. The Phase <br />II report will be available to Boyle in word processor format that can be directly imported to Microsoft <br />Word for Windows. <br /> <br />.' <br /> <br />Phase IIla Scope of Services <br /> <br />" <br />1149 <br /> <br />A.35 <br /> <br />Jan 31, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.